• 热门标签

当前位置: 主页 > 航空资料 > 国外资料 >

时间:2011-08-13 14:25来源:蓝天飞行翻译 作者:航空
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

(AFFSA/AFFSA FIL 05-109)


2.
CAUTION - Expect heavy concentrations of waterfowl from October - April. Large flocks of seagulls and sparrows are active throughout the year. Expect higher concentrations of bird activity during peak bird hours: 30 minutes prior to and 90 minutes after sunrise and sunset. Contact Airfield Management DSN 445-2861 for Bird Watch Conditions (BWC). BWC will be issued as follows: (Restrictions are enforced on AMC controlled assets only: other aircraft proceed at your own risk).


a.
LOW - Low probability of hazard on airport and departure and arrival routes. Increased vigilance required when flying outside of these areas. RESTRICTIONS - Practice approaches and mission operations approved.

b.
MODERATE - Concentrations of 5 to 15 large birds or 15 to 30 small birds observable in locations that represent a probable hazard to safe flying operations. RESTRICTIONS - Practice approaches prohibited (applies to both IFR and VFR pattern activity). AMC mission operations approved as long as a safe departure/arrival is coordinated using all means available.

c.
SEVERE - Visual sightings by aircrew or tower personnel of heavy concentrations of birds (more than 15 large birds or 30 small birds) on or above the runway, taxiways, infield areas and


arrival or departure routes. RESTRICTIONS - Practice approaches prohibited. Mission operations require 436 OG/CC approval (contact Command Post).
BASH Phase II is implemented during the migratory and flocking bird seasons that historically take place from early October to early April. During BASH Phase II operations, aircraft on TACC missions are restricted to full stop landings and mission departures during peak bird hours.  Additionally, aircrews expect ATC to use a minimum radar pattern altitude of 3000 feet AGL to the maximum extent possible. OG/CC approval required for home station departures or training missions during peak bird hours.
(436 OSS-OSAA/436 OSS-OSAA FIL 07-823)

3. NOISE ABATEMENT - Avoid overflying the following areas:
a.
Beach Towns.

b.
Town of Little Creek, 1 or 2 NM NE of Runway 19.

c.
All housing units, including single trailers, to the


maximum extent possible. (436 OSS-OSAA/436 OSS-OSAA FIL 07-869)
4.
PPR for all aircraft requiring remote/isolated parking to include all hazardous material onloads, enroutes and offloads as outlined in AFI 11-204, AR 95-27 and OPNAVINST 3170.31. For Hot Cargo Pad reservations and PPR number contact ATOC DSN 445-2303/2304, C302-677-2303/2304.

5.
DEPARTURES - To expedite departures from Dover AFB (KDOV), Washington Air Route Traffic Control Center (KZDC) has established air traffic flow restrictions. Standard Instrument Departure (SID) or the routes listed below must be filed.


(AFFSA/AFFSA)

a.
SW - ENO BAL then to join:

(1)
J6, J134 via BAL 303/020 LDN
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:DFIP AREA PLANNING NORTH AND SOUTH 2(5)