(4) Remove the nuts (8), the washers (7) and the swivel ends (6).
R 1EFF : 001-049, 051-099, 101-149, 201-299, 1 38-14-48Page 407 1 1 May 01/05 1 1 1CES 1
TASK 38-14-48-400-001
Installation of the Control Cable 3260MM (3261MM)
1. Reason for the Job
__________________
Self Explanatory
2. Job Set-up Information
______________________
A. Fixtures, Tools, Test and Support Equipment
-------------------------------------------------------------------------------REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
No specific warning notice
No specific access platform 1.5 m (4 ft. 11 in.)
No specific access platform 1 m (3 ft. 3 in.)
No specific access platform 2 m (6 ft. 7 in.)
No specific access platform 3.5 m (11 ft. 6 in.)
B. Consumable Materials
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
No specific 0.8 mm lockwire
Material No. 04-004 USA MIL-PRF-23827 TYPE I SYNTH.ESTER BASED GREASE HIGH PRESSURE (Ref. 20-31-00)
Material No. 11-004 USA MIL-T-81533 1.1.1TRICHLOROETHANE (METHYL CHLOROFORM) (Ref. 20-31-00)
C. Expendable Parts
-------------------------------------------------------------------------------FIG.ITEM |DESIGNATION |IPC-CSN -------------------------------------------------------------------------------
cotter pin 38-14-48 01 -040
R 1EFF : 001-049, 051-099, 101-149, 201-299, 1 38-14-48Page 408 1 1 May 01/05 1 1 1CES 1
D. Referenced Information
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
12-15-38-613-001 Fill the Potable Water Tank System (Aircraft
Electrical Power Available)
24-42-00-861-001 Energize the Ground Service Network from the External
Power
24-42-00-862-001 De-energize the Ground Service Network Supplied from
the External Power
38-10-00-614-001 Pressurization of the Potable Water System from a
Ground Air Supply
38-10-00-614-002 Depressurization of the Potable Water System
52-10-00-010-001 Opening of the Passenger/Crew Door
52-10-00-410-001 Closing of the Passenger/Crew Door
52-30-00-860-001 Open the FWD or AFT Cargo-Compartment Door with the
Yellow Electric Pump
52-30-00-860-002 Close the FWD or AFT Cargo-Compartment Door with the
Yellow Electric Pump
38-14-48-991-001 Fig. 401
38-14-48-991-002 Fig. 402
38-14-48-991-003 Fig. 403
3. Job Set-up__________
Subtask 38-14-48-860-050
A. Aircraft Maintenance Configuration
(1)
Make sure that the ground service network is energized (Ref. TASK 24-42-00-861-001).
(2)
Make sure that the system potable water is depressurized (Ref. TASK 38-10-00-614-002).
Subtask 38-14-48-010-054
B. Get Access
(1)
Make sure that the access platform is in position in front of the applicable passenger/crew door 832 or 842.
(2)
Make sure that the passenger/crew door 832 or 842 is open (Ref. TASK 52-10-00-010-001).
R 1EFF : 001-049, 051-099, 101-149, 201-299, 1 38-14-48Page 409 1 1 May 01/05 1 1 1CES 1
(3)
Make sure that the access platform is in position at the drain and overflow panel 192NB.
(4)
Make sure that the drain and overflow panel 192NB is open.
(5)
Make sure that the warning notice is in position in the drain and overflow panel.
(6)
Make sure that the access platform is in position at the service panel 2023VU.
(7)
Make sure that the access door 171AL of the service panel 2023VU is open.
(8)
Make sure that the warning notice is in position in the service panel 2023VU.
(9)
Make sure that the access platform is in position at the door 825.
(10)
Make sure that the FWD cargo-compartment door 825 is open (Ref. TASK 52-30-00-860-001).
(11)
Make sure that the CARGO COMPT LIGHT switch 6LU is at ON.
(12)
Make sure that in the FWD cargo-compartment, the partition panel 131PW is removed.
Subtask 38-14-48-865-051