(5)
Close the AFT cargo-compartment door (Ref. TASK 52-30-00-860-002).
(6)
Remove the access platform(s).
(7)
Remove the ground support and maintenance equipment, the special and standard tools and all other items.
Subtask 38-13-16-862-050
B. De-energize the ground service network
(Ref. TASK 24-42-00-862-001).
INDICATOR QUANTITY (6MA) - REMOVAL/INSTALLATION
_______________________________________________ TASK 38-13-21-000-001 Removal of the Quantity Indicator 6MA NOTE : Two persons must do this task. One must work inside of zone 170 and the
____ other outside of zone 170.
1.
Reason for the Job
__________________
Self Explanatory
2.
Job Set-up Information
______________________
A. Fixtures, Tools, Test and Support Equipment
-------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific circuit breaker(s) safety clip(s) No specific access platform 2 m (6 ft. 7 in.)
B. Referenced Information
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
24-42-00-861-001 Energize the Ground Service Network from the External
Power 38-10-00-614-002 Depressurization of the Potable Water System 52-30-00-860-001 Open the FWD or AFT Cargo-Compartment Door with the
Yellow Electric Pump 38-13-21-991-001 Fig. 401
3. Job Set-up
__________ Subtask 38-13-21-861-050
A. Energize the ground service network
(Ref. TASK 24-42-00-861-001).
1EFF : ALL 1 38-13-21Page 401 1 1 Aug 01/00R 1 1 1CES 1
Subtask 38-13-21-010-050
B. Get Access
(1)
Put the access platform in position.
(2)
Open the AFT cargo-compartment door (Ref. TASK 52-30-00-860-001).
(3)
Remove the panel 161DW from the aft bulkhead of the bulk cargo compartment.
(4) Open the panel 171AL.
Subtask 38-13-21-614-050
C. Depressurize the potable water system
(1) Drain the water from the potable water tank 3000MM (Ref. TASK 38-10-00-614-002).
R **ON A/C 001-049, 101-105,
Subtask 38-13-21-865-053-B
D. Open, safety and tag this(these) circuit breaker(s): -------------------------------------------------------------------------------PANEL SERVICE IDENT. LOCATION -------------------------------------------------------------------------------
2000VU WATER SYSTEM - QUANT IND 1MA B01 R
R **ON A/C 051-099, 106-149, 201-299,
Subtask 38-13-21-865-053
D. Open, safety and tag this(these) circuit breaker(s): -------------------------------------------------------------------------------PANEL SERVICE IDENT. LOCATION -------------------------------------------------------------------------------
2000VU WATER SYS - QUANT IND 1MA B01
R **ON A/C 151-199, 301-399, 401-499,
Subtask 38-13-21-865-053-A
D. Open, safety and tag this(these) circuit breaker(s): -------------------------------------------------------------------------------PANEL SERVICE IDENT. LOCATION -------------------------------------------------------------------------------
2001VU WATER SYS - QUANT IND 1MA B06
**ON A/C ALL
4. Procedure
_________
(Ref. Fig. 401/TASK 38-13-21-991-001)
Subtask 38-13-21-020-051
A. Removal of the Quantity Indicator 6MA
(1)
Disconnect the electrical connector (1) from the quantity indicator (2).
(2)
Put blanking caps on the disconnected electrical connectors.
(3)
Remove the sealant from from the fasteners of the quantity indicator
(2) with a nonmetallic scraper (inside of zone 170).
(4)
Remove the nuts (5) and the washers (6) from the screws (9).
(5)
Remove the screws (9), the flange (8) and the seal (7).
(6)
Hold the quantity indicator (2) from the outside of zone 170 and remove the screws (4) and (10).
(7)
Remove the clamp (3) from inside zone 170 and the quantity indicator
(2) from outside of zone 170.
Quantity Indicator 6MA Figure 401/TASK 38-13-21-991-001
1EFF : 1 1R 1CES ALL 1 11 1 38-13-21 Page 404 Aug 01/00
TASK 38-13-21-400-001
Installation of the Quantity Indicator 6MA
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM WATER/WASTE 1(64)