CHAPTER 38
__________
WATER/WASTE
TABLE OF CONTENTS
_________________
SUBJECT_______ CH/SE/SU _ PAGE EFFECTIVITY
________ C ____ ___________ 101-105, 151-199 201-299,
Liquid Level Sensor 41MG 44 001-049, 051-099 101-105, 151-199 201-299,
Liquid Level Transmitter 40MG 44 106-149, 301-399 401-499, Liquid Level Sensor 41MG 44 106-149, 301-399 401-499,
Vacuum System Controller 31MG 45 001-049, 051-099 101-105, 151-199 201-299,
Test 45 ALL
System Monitoring and Control 45 001-049, 051-099 101-105, 151-199 201-299,
System Monitoring and Control 56 106-149, 301-399 401-499,
TOILET SYSTEM 38-31-00
MAINTENANCE PRACTICES 201 ALL Draining of the Toilet System 201 ALL Adjustment of the Contact Point of 205 ALL the Waste Service-Panel-Door Limit-Switch (44MG) Adjustment of the Altitude 209 001-049, 051-099 Pressure Switch (43MG) 101-105, 151-199
201-299,
TOILET SYSTEM 38-31-00
ADJUSTMENT/TEST 501 ALL
Operational Test of the Vacuum 501 ALL
Toilet System
BITE Test of the Vacuum Toilet 515 ALL
System
Operational Test of the Antisyphon 522 ALL
Valve
Operational Test of the Vacuum 527 ALL
Toilet System (vacuum generator
not working)
Functional Test of the Flush 531 ALL
Control Unit (FCU)
Leak Test of the Vacuum Toilet 540 ALL
System
38-CONTENTS Page 8 Aug 01/05 R CES
CHAPTER 38
__________
WATER/WASTE
TABLE OF CONTENTS
_________________
SUBJECT_______ CH/SE/SU _ PAGE EFFECTIVITY
________ C ____ ___________ Operational Test of the Door Limit 548 ALL Switch 44MG Operational Test of the Toilet 552 ALL Unit Functional Test of the Liquid 557 ALL Level Sensor 41MG and Transmitter 40MG
TOILET SYSTEM 38-31-00
CLEANING/PAINTING 701 ALL Cleaning of the Waste Holding Tank 701 ALL Cleaning of the Toilet Waste Lines 712 ALL with High Pressure Equipment Cleaning of the Toilet Waste Lines 719 ALL with Crushed Ice Cleaning of the Flow Diverter in 723 ALL the Waste Holding Tank Removal of Blockages at the Inlet 734 004-049, 051-099 Area of the Waste Holding Tank 101-149, 151-199
201-299, 301-399
401-499, Cleaning of the Liquid Level 741 ALL Transmitter (LLT) Reference Line Cleaning of the Vacuum Waste Lines 746 ALL with Chemical Cleaning Agent and Crushed Ice Special Cleaning of the Waste Tank 750 ALL Area and Related Component Inspections
CONTROL UNIT - FLUSH 38-31-12
REMOVAL/INSTALLATION 401 ALL
Removal of the Flush Control Unit 401 ALL
Installation of the Flush Control 407 ALL
Unit
LIMIT SWITCH - WASTE PANEL DOOR 38-31-13
REMOVAL/INSTALLATION 401 ALL
Removal of the Waste Service-Panel 401 ALL
Door Limit-Switch (44MG)
Installation of the Waste 405 ALL
Service-Panel Door Limit-Switch
(44MG)
SWITCH - TOILET FLUSH 38-31-19
REMOVAL/INSTALLATION 401 ALL
Removal of the Toilet Flush Switch 401 ALL
Installation of the Toilet Flush 405 ALL
38-CONTENTS Page 9 Aug 01/05 R CES
CHAPTER 38
__________
WATER/WASTE
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM WATER/WASTE 1(14)