• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-03-26 09:18来源:蓝天飞行翻译 作者:admin
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

 **ON A/C ALL
 4. Procedure
_________
 **ON A/C 001-049, 051-099, 101-149, 201-299,

 (Ref. Fig. 401/TASK 38-13-11-991-001) R **ON A/C 151-199, 301-399, 401-499,
 (Ref. Fig. 401A/TASK 38-13-11-991-001-A)
 **ON A/C 001-049, 051-099, 101-149, 201-299,

 Subtask 38-13-11-020-050
 A. Removal of the Quantity Transmitter 3MA WARNING : MAKE SURE THAT THE POTABLE WATER SYSTEM IS DEPRESSURIZED. A
_______ PRESSURIZED SYSTEM CAN CAUSE INJURY TO PERSONS WHEN THEY DO WORK ON IT.
 (1)
 Disconnect the electrical connector (5) from the quantity transmitter (1).

 (2)
 Put blanking caps on the disconnected electrical connectors.

 


 Removal/Installation of the Quantity Transmitter 3MA
 Figure 401/TASK 38-13-11-991-001

R 1EFF : 001-049, 051-099, 101-149, 201-299, 1 38-13-11Page 405 1 1 May 01/05 1 1 1CES 1


 Removal/Installation of the Quantity Transmitter 3MA
 Figure 401A/TASK 38-13-11-991-001-A

R 1EFF : 151-199, 301-399, 401-499, 1 38-13-11Page 406 1 1 Aug 01/05 1 1 1CES 1


 (3)
 Remove the nuts (4) and the washers (3).


 (4)
 Remove the quantity transmitter (1).

 (5)
 Put a PLUG - BLANKING into the hole in the potable water tank.


 (6) Remove and discard the packing (2). R **ON A/C 151-199, 301-399, 401-499,
 Subtask 38-13-11-020-050-A
 A. Removal of the Quantity Transmitter 3MA WARNING : MAKE SURE THAT THE POTABLE WATER SYSTEM IS DEPRESSURIZED. A
_______ PRESSURIZED SYSTEM CAN CAUSE INJURY TO PERSONS WHEN THEY DO WORK ON IT.
 (1)
 Disconnect the electrical connector (5) from the quantity transmitter (1).

 (2)
 Put blanking caps on the disconnected electrical connectors.

 (3)
 Remove all the connections and the attachment clamps (Ref. TASK 38-11-41-000-001) but do not remove the tank.

 (4)
 Turn the tank so that the transmitter is free for removal.

 (5)
 Remove the nuts (4) and the washers (3).

 (6)
 Remove the quantity transmitter (1).

 (7)
 Put a PLUG - BLANKING into the hole in the potable water tank.

 (8)
 Remove and discard the packing (2).

 

 **ON A/C ALL


 TASK 38-13-11-400-001
 Installation of the Quantity Transmitter 3MA
 1. Reason for the Job
__________________
 Self Explanatory
 2. Job Set-up Information
______________________
 A. Expendable Parts
 -------------------------------------------------------------------------------FIG.ITEM |DESIGNATION |IPC-CSN -------------------------------------------------------------------------------
packing 38-13-11 06 -010
 B. Referenced Information
 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
12-15-38-613-001 Fill the Potable Water Tank System (Aircraft Electrical Power Available) 24-42-00-861-001 Energize the Ground Service Network from the External Power 24-42-00-862-001 De-energize the Ground Service Network Supplied from
 the External Power 25-21-41-400-001 Installation of the Passenger Seats 25-28-41-400-001 Installation of the Textile Floor-Covering 38-10-00-614-001 Pressurization of the Potable Water System from a
 Ground Air Supply 38-10-00-670-002 Sterilization of Water Tank and Distribution System 38-11-41-400-002 Installation of the Potable Water Tank 3000MM 38-13-00-710-001 Operational Test of the Quantity Indicating System 52-30-00-860-002 Close the FWD or AFT Cargo-Compartment Door with the
 Yellow Electric Pump 53-32-12-400-002 Installation of the Cabin Floor Panels
 1EFF : ALL 1 38-13-11Page 408 1 1 May 01/04R 1 1 1CES 1


 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
**ON A/C 001-049, 051-099, 101-149, 201-299,
 38-13-11-991-001 Fig. 401 R **ON A/C 151-199, 301-399, 401-499,
 38-13-11-991-001-A Fig. 401A
 **ON A/C ALL

 3. Job Set-up
__________
 Subtask 38-13-11-860-051

 A. Aircraft Maintenance Configuration
 (1) Make sure that the ground service network is energized (Ref. TASK 24-42-00-861-001).
 Subtask 38-13-11-560-050
 B. Preparation for Installation
 (1)
 Clean the component interface and/or the adjacent area.

 (2)
 Do an inspection of the component interface and/or the adjacent area.
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM WATER/WASTE 1(60)