(8)
Remove the control handle assembly (12) from the service panel.
(9)
Loosen the nut (1) at the swivel end (6) and remove the casing (2).
(10) Remove the nut (4) the washer (5) and the swivel end (6).
Control Cable 3254MM
Figure 401/TASK 38-14-47-991-001
R 1EFF : 001-049, 051-099, 101-149, 201-299, 1 38-14-47Page 404 1 1 May 01/05 1 1 1CES 1
Control Cable 3254MM
Figure 401A/TASK 38-14-47-991-001-A
R 1EFF : 151-199, 301-399, 401-499, 1 38-14-47Page 405 1 1 Aug 01/05 1 1 1CES 1
TASK 38-14-47-400-001
Installation of the Control Cable 3254MM
1. Reason for the Job
__________________
Self Explanatory
2. Job Set-up Information
______________________
A. Fixtures, Tools, Test and Support Equipment
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
No specific nonmetallic scraper
B. Consumable Materials
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
Material No. 04-004 USA MIL-PRF-23827 TYPE I
SYNTH.ESTER BASED GREASE HIGH PRESSURE
(Ref. 20-31-00)
Material No. 05-013 D TV-53-3507/73 RELEASE AGENT (OBSOLETE USE 05-013A) (Ref. 20-31-00)
Material No. 09-019 USA AMS 3267/3
LOW ADHESION CORROSION INHIBITING SEALANT
(Ref. 20-31-00)
Material No. 11-002 USA MIL-PRF-680
DRY CLEANING SOLVENT (VARSOL/WHITE SPIRIT)
(Ref. 20-31-00)
R Material No. 11-003 USA ASTM D 740 METHYL-ETHYL-KETONE (Ref. 20-31-00)
C. Expendable Parts
-------------------------------------------------------------------------------
FIG.ITEM |DESIGNATION |IPC-CSN
-------------------------------------------------------------------------------
9 cotter pin 38-11-04 11 -310A 9 cotter pin 38-14-47 01A-190
D. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
12-16-38-613-001 Servicing of the Toilet System 24-41-00-861-002 Energize the Aircraft Electrical Circuits from the External Power 24-42-00-862-001 De-energize the Ground Service Network Supplied from
the External Power 38-10-00-614-002 Depressurization of the Potable Water System 52-30-00-860-001 Open the FWD or AFT Cargo-Compartment Door with the
Yellow Electric Pump 52-30-00-860-002 Close the FWD or AFT Cargo-Compartment Door with the Yellow Electric Pump
**ON A/C 001-049, 051-099, 101-149, 201-299,
38-14-47-991-001 Fig. 401
R **ON A/C 151-199, 301-399, 401-499,
38-14-47-991-001-A Fig. 401A
**ON A/C ALL
3. Job Set-up
__________
Subtask 38-14-47-860-050
A. Aircraft Maintenance Configuration
(1)
Make sure that the ground service network is energized from the external power (Ref. TASK 24-41-00-861-002).
(2)
Make sur that the potable water system is depressurized (Ref. TASK 38-10-00-614-002).
(3)
Make sure that the AFT cargo compartment door is open (Ref. TASK 52-30-00-860-001).
**ON A/C 001-049, 051-099, 101-149, 201-299,
Subtask 38-14-47-865-055
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged -------------------------------------------------------------------------------PANEL SERVICE IDENT. LOCATION -------------------------------------------------------------------------------
2000VU WATER SYS - QUANT IND 1MA B01
R **ON A/C 151-199, 301-399, 401-499,
Subtask 38-14-47-865-055-A
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged -------------------------------------------------------------------------------PANEL SERVICE IDENT. LOCATION -------------------------------------------------------------------------------
2001VU WATER SYS - QUANT IND 1MA B06
**ON A/C ALL
4. Procedure
_________
Subtask 38-14-47-560-050
A. Preparation for Installation
**ON A/C 001-049, 051-099, 101-149, 201-299,
(Ref. Fig. 401/TASK 38-14-47-991-001)
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM WATER/WASTE 1(90)