(e)
Install the clamshell (15) over the sleeve (3) and make sure that the locking device is turned downward.
(f)
Install the lock pin in the clamshell.
(g)
Seal the clamshell with SEALANTS (Material No. 09-018).
R 1EFF : 001-049, 051-099, 101-149, 151-199, 1 38-30-00Page 224 1201-299, 401-499, 1Aug 01/05 1 1 1CES 1
(9) Example G.
R (a) Put the caution placard (13) in position and fastend it with tie-R wraps (14).
**ON A/C 301-399,
Subtask 38-30-00-420-058-A
A. Installation of the Toilet Drain Lines
(1)
Examples A, B, C, D, and E.
(a) Put the drain lines (1) in position.
(2)
Example B.
(a)
Put the clamp assemblies (7) and the spacers (8) in position.
(b)
Install the washers (6), the bolts (5) and the nuts (9) but do not tighten them at this time.
(3)
Example C.
(a)
Put the clamps (10) in position.
(b)
Put the washers (6) on the bolts (5).
(c)
Install the bolts (5), the spacers (8), the washers (6) and the nuts (9).
(4)
Example E.
(a)
Put the clamp assemblies (7) in position.
(b)
Install the washers (6), the bolts (5), the washers (6) and the nuts (9) but do not tighten them at this time.
(5)
Example A.
(a)
Move the sleeves (3) over the drain lines (1).
(b)
Install the clamshells (4).
(6)
Examples B, C, and E.
(a) Tighten the bolts (5) and the nuts (9).
(7)
Example D.
(a)
Put the clamps (11) in position.
(b)
Install the washers (6), the bolts (5), the bonding straps (12) and the nuts (9).
(c)
Make sure that the bonding straps are correctlly bonded (Ref. TASK 20-28-00-912-004).
**ON A/C 001-049, 051-099, 101-105,
Subtask 38-30-00-865-075
B. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s): -------------------------------------------------------------------------------PANEL SERVICE IDENT. LOCATION -------------------------------------------------------------------------------2001VU VACUUM TOILET SYSTEM/LAVATORY POWER 32MG A01 2001VU VACUUM TOILET SYSTEM/LAVATORY POWER 45MG A02 2001VU VACUUM TOILET SYSTEM/LAVATORY POWER 39MG A03 2001VU VACUUM TOILET SYSTEM/LAVATORY POWER 34MG A04 2001VU VACUUM TOILET SYSTEM/VACUUM SYS 35MG A06 2001VU VACUUM TOILET SYSTEM/VACUUM GEN 33MG A08
**ON A/C 106-149, 151-199, 201-299,
Subtask 38-30-00-865-075-A
B. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s): -------------------------------------------------------------------------------PANEL SERVICE IDENT. LOCATION -------------------------------------------------------------------------------2001VU VACUUM TOILET SYSTEM/LAVATORY POWER A 32MG A01 2001VU VACUUM TOILET SYSTEM/LAVATORY POWER 45MG A02 2001VU VACUUM TOILET SYSTEM/LAVATORY POWER D 39MG A03 2001VU VACUUM TOILET SYSTEM/LAVATORY POWER E 34MG A04 2001VU VACUUM TOILET SYSTEM/VACUUM SYS 35MG A06 2001VU VACUUM TOILET SYSTEM/VACUUM GEN 33MG A08
R 1EFF : 001-049, 051-099, 101-149, 151-199, 1 38-30-00Page 226 1201-299, 301-399, 1Aug 01/05 1 1 1CES 1
R **ON A/C 301-399,
R Subtask 38-30-00-865-075-B
R R R R R R R R R R R B. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s): -------------------------------------------------------------------------------PANEL SERVICE IDENT. LOCATION -------------------------------------------------------------------------------2001VU VACUUM TOILET SYSTEM/LAVATORY POWER A 32MG A01 2001VU VACUUM TOILET SYSTEM/LAVATORY POWER L 45MG A02 2001VU VACUUM TOILET SYSTEM/LAVATORY POWER D 39MG A03 2001VU VACUUM TOILET SYSTEM/LAVATORY POWER E 34MG A04 2001VU VACUUM TOILET SYSTEM/VACUUM SYS 35MG A06 2001VU VACUUM TOILET SYSTEM/VACUUM GEN 33MG A08
**ON A/C ALL
Subtask 38-30-00-790-054
C. Leak Test
(1) Do the leak test of the vacuum toilet (Ref. TASK 38-31-00-790-002).
(2) Inspect the drain lines to make sure that there are no leaks.
(3) Leaks are not allowed.
Subtask 38-30-00-613-057
D. Do the servicing of the toilet system (Ref. TASK 12-16-38-613-001).
5. Close-up
________ R **ON A/C 001-049, 051-099, 101-149, 201-299,
Subtask 38-30-00-410-056-A
A. Close Access
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM WATER/WASTE 1(111)