• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-03-26 09:18来源:蓝天飞行翻译 作者:admin
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

-push and hold the door limit switch 5MA.
6. At the FAP 120RH/miscellaneous panel WATER AND WASTE 124RH:
-push and hold the membrane switch 'IND ON'.
7. At the service panel 2023VU:
-fill the potable water tank with 165.0 l (43.59 USgal) of water.
 8. At the service panel 2023VU:
-push and hold the door limit switch 5MA.
9. At the FAP 120RH/miscellaneous panel WATER AND WASTE 124RH:
On the FAP 120RH/miscellaneous panelWATER AND WASTE 124RH:
-there is no indication.
On the FAP 120RH/miscellaneous panelWATER AND WASTE 124RH:
-
the quantity indicator shows 25%full.

At the service panel 2023VU:

-
the quantity indicator 6MA shows 1/2full.

 On the FAP 120RH/miscellaneous panel WATER AND WASTE 124RH:

 -
the quantity indicator shows 50% full.


On the FAP 120RH/miscellaneous panelWATER AND WASTE 124RH:
-there is no indication.
On the FAP 120RH/miscellaneous panelWATER AND WASTE 124RH:
-
the quantity indicator shows 50%full.

At the service panel 2023VU:

-
the quantity indicator 6MA shows 3/4full.

 On the FAP 120RH/miscellaneous panel WATER AND WASTE 124RH:

 -
the quantity indicator shows 75% full.


On the FAP 120RH/miscellaneous panelWATER AND WASTE 124RH:
-there is no indication.
On the FAP 120RH/miscellaneous panelWATER AND WASTE 124RH:
R 1EFF : 151-199, 301-399, 401-499, 1 38-13-00Page 505 1 1 Aug 01/05 1 1 1CES 1


 -------------------------------------------------------------------------------ACTION RESULT -------------------------------------------------------------------------------
- push and hold the membrane switch 'IND ON'. 
R R R  10. At the service panel 2023VU: - fill the potable water tank with 220 l (58.12 USgal) of water. 

11. At the service panel 2023VU:
-push and hold the door limit switch 5MA.
 12. At the FAP 120RH/miscellaneous panel WATER AND WASTE 124RH:
-push and hold the membrane switch 'IND ON'.
**ON A/C ALL
 5. Close-up
________
 Subtask 38-13-00-080-050
-
the quantity indicator shows 75%full.

At the service panel 2023VU:

-
the motorized fill/overflow/drain valve 8MA closes.

-
the TANK FULL control light comes on.

 -
the quantity indicator 6MA shows full.

 -
the fill and drain handle goes back to the NORMAL position.

 On the FAP 120RH/miscellaneous panel WATER AND WASTE 124RH:

 -
the quantity indicator shows 100% full.

At the service panel 2023VU:

-
the TANK FULL control light goes off.


 On the FAP 120RH/miscellaneous panel WATER AND WASTE 124RH:
 -there is no indication.
On the FAP 120RH/miscellaneous panelWATER AND WASTE 124RH:
-the quantity indicator shows 100%full.
 A. Disconnect the water service vehicle. Subtask 38-13-00-862-050
 B. De-energize the ground service network the aircraft electrical network (Ref. TASK 24-42-00-862-001).


 Subtask 38-13-00-410-050

 C. Close the service panel 171AL.

 1EFF : ALL 1 38-13-00Page 507 1 1 Feb 01/00R 1 1 1CES 1

 TASK 38-13-00-710-002


 Operational Test of the Door Limit Switch 5MA
 1.
 Reason for the Job

__________________
 Self Explanatory


 2.
 Job Set-up Information


______________________
 A. Fixtures, Tools, Test and Support Equipment
 -------------------------------------------------------------------------------
REFERENCE  QTY DESIGNATION
 -------------------------------------------------------------------------------
R No specific  1 ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE
 B. Referenced Information
 -------------------------------------------------------------------------------
REFERENCE  DESIGNATION
 -------------------------------------------------------------------------------
12-24-38-680-001  Draining of the Potable Water System (with Electrical Power) 24-42-00-861-001 Energize the Ground Service Network from the External Power 24-42-00-862-001 De-energize the Ground Service Network Supplied from the External Power
 3. Job Set-up
__________
 Subtask 38-13-00-861-051

 A. Energize the ground service network
 aircraft electrical circuits (Ref. TASK 24-42-00-861-001).

 Subtask 38-13-00-865-051
 B. Make sure that this(these) circuit breaker(s) is(are) closed:
 -1MA, 1MP


 Subtask 38-13-00-010-051

 C. Get Access
 (1) Put an ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE in position below the potable water service-panel.
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM WATER/WASTE 1(57)