* The given volume includes the volume of the potable water
tank and the distribution system.
** The mass is calculated for pure hydrogen peroxide (H2O2).
*** The value is for disinfectant which contains approximately
50% active hydrogen peroxide.
**** The value is for disinfectant which contains
approximately 3% active hydrogen peroxide.
You must obey the manufacturer's mixing instructions when you
use these products.
NOTE : You must let the water flow longer through the water faucets
____ in the lavatories and the galleys to remove the contamination.
Subtask 38-10-00-618-050
E. Preparation for Cold Weather Condition
(1)
Obey the cold weather maintenance procedure (Ref. TASK 12-31-38-660-001).
(2)
If the temperature in the aircraft is below 4 DEG.C (39.20 DEG.F) do the pre-conditioning procedure (Ref. TASK 12-33-21-618-001).
R **ON A/C 001-049, 101-105,
Subtask 38-10-00-865-063
F. Open, safety and tag this(these) circuit breaker(s): -------------------------------------------------------------------------------PANEL SERVICE IDENT. LOCATION -------------------------------------------------------------------------------
2000VU WATER SYS - QUANT IND 1MA B01 2000VU LAV FWD - HOT WATER 1MB F02 2001VU LAVATORY AFT/HOT WATER 2MB B02 2001VU LAVATORY AFT/HOT WATER 9MB B03 2001VU VACUUM TOILET SYSTEM/LAVATORY POWER 32MG A01 2001VU VACUUM TOILET SYSTEM/LAVATORY POWER 45MG A02 2001VU VACUUM TOILET SYSTEM/LAVATORY POWER 39MG A03 2001VU VACUUM TOILET SYSTEM/LAVATORY POWER 34MG A04 2001VU VACUUM TOILET SYSTEM/LAVATORY POWER 35MG A06 2001VU VACUUM TOILET SYSTEM/VACUUM GEN 33MG A08 2001VU WATER SYS - DRAIN 1MP D01
R **ON A/C 051-099,
R Subtask 38-10-00-865-063-D
R F. Open, safety and tag this(these) circuit breaker(s):
R -------------------------------------------------------------------------------
R PANEL SERVICE IDENT. LOCATION
R -------------------------------------------------------------------------------
R 2000VU WATER SYS - QUANT IND 1MA B01
R 2000VU LAV FWD - HOT WATER 1MB F02
R 2001VU LAVATORY AFT HOT WATER 2MB B02
R 2001VU LAVATORY AFT HOT WATER 9MB B03
R 2001VU VACUUM TOILET SYSTEM/LAVATORY POWER 32MG A01
R 2001VU VACUUM TOILET SYSTEM/VACUUM GEN 33MG A08
R 2001VU VACUUM TOILET SYSTEM/LAVATORY POWER 34MG A04
R 2001VU VACUUM TOILET SYSTEM/VACUUM SYS 35MG A06
R 2001VU VACUUM TOILET SYSTEM/LAVATORY POWER 39MG A03
R 2001VU VACUUM TOILET SYSTEM/LAVATORY POWER 45MG A02
R 2001VU WATER SYS - DRAIN 1MP D01
R **ON A/C 106-149, 201-299,
Subtask 38-10-00-865-063-A
F. Open, safety and tag this(these) circuit breaker(s):
-------------------------------------------------------------------------------
PANEL SERVICE IDENT. LOCATION
-------------------------------------------------------------------------------
2000VU WATER SYS - QUANT IND 1MA B01
2000VU LAV FWD - HOT WATER 1MB F02
2001VU LAVATORY AFT - HOT WATER 2MB B02
2001VU LAVATORY AFT - HOT WATER 9MB B03
2001VU VACUUM TOILET SYSTEM/LAVATORY POWER 32MG A01
2001VU VACUUM TOILET SYSTEM/LAVATORY POWER 45MG A02
2001VU VACUUM TOILET SYSTEM/LAVATORY POWER 39MG A03
2001VU VACUUM TOILET SYSTEM/LAVATORY POWER 34MG A04
2001VU VACUUM TOILET SYSTEM/VACUUM SYS 35MG A06
2001VU VACUUM TOILET SYSTEM/VACUUM GEN 33MG A08
2001VU WATER SYS - DRAIN 1MP B05
R 1EFF : 051-099, 106-149, 201-299, 1 38-10-00Page 207
1 1 May 01/05 1 1 1CES 1
R **ON A/C 151-199, 401-499,
Subtask 38-10-00-865-063-B
F. Open, safety and tag this(these) circuit breaker(s): -------------------------------------------------------------------------------
PANEL ------ SERVICE ------------------------------------------------------- IDENT. LOCATION------------------
2001VU WATER SYS - QUANT IND 1MA B06
2000VU LAV FWD - HOT WATER 1MB F02
2001VU LAVATORY AFT - HOT WATER D 2MB B02
2001VU LAVATORY AFT - HOT WATER E 9MB B03
2001VU VACUUM TOILET SYSTEM/LAVATORY POWER A 32MG A01
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM WATER/WASTE 1(19)