• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-03-26 09:18来源:蓝天飞行翻译 作者:admin
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

 -
the limit switch 3MP is energized.

 -
the motorised overflow vavle 8MP opens.


R 1EFF : 001-049, 051-099, 101-149, 201-299, 1 38-14-47Page 411 1 1 May 01/05 1 1 1CES 1


 -------------------------------------------------------------------------------ACTION RESULT -------------------------------------------------------------------------------
- operate the fill/drain handle from the drain to the normal position.

R **ON A/C 151-199, 301-399, 401-499,
 Subtask 38-14-47-820-050-A
 C. Adjustment of the Control Cable
 -
the motorised drain valves 14MP and 4MP open.

 -
the control lights 6MP, 12MP, and 2MP come on.

-
the lever of the fill/drain valve16MA moves from the open to theclosed position.

 -
the limit switch 3MP is de-energized.

 -
the motorised drain valves 14MP and 4MP closes.

 -
the motorised overflow vavle 8MP closes.

 -
the control lights 6MP, 12MP, and 2MP go off.


(Ref. Fig. 401A/TASK 38-14-47-991-001-A)
 (1)
 Make sure that the fill/overflow and drain handle is in the normal position.

 (2)
 Hold the lever of the fill/overflow and drain valve 8MA in the closed position.

 (3)
 Adjust the sliding end (11) until you can install the pin (7). NOTE : The sliding end (11) is left hand threaded.

____

 (4)
 Make sure that you can feel or see the cable (3) through the inspection hole in the sliding end (11).

 (5)
 Install the pin (7) the washer (8) and the new cotter pin (9).

 (6)
 Tighten the nut (10).

 


 Subtask 38-14-47-865-056-A

 D. Remove the safety clip(s) and the tag(s) and close this(these) circuit
 breaker(s): -------------------------------------------------------------------------------
PANEL ------ SERVICE ----------------------------------------- IDENT. LOCATION--------------------------------
2001VU WATER SYS - QUANT IND  1MA  B06
 Subtask 38-14-47-720-050-A
 E. Do this test.

 -------------------------------------------------------------------------------ACTION RESULT -------------------------------------------------------------------------------
1. At the service panel 2023VU:
- operate the fill/overflow and drain handle from the normal to the drain position.
- operate the fill/overflow and drain handle from the drain to the normal position.
**ON A/C ALL
 5. Close-up________In the potable water system:
-
the lever of the fill/overflow anddrain valve 8MA moves from the closedto the open position.

 -
the limit switch 3MP is energized.

 -
the motorized drain valve 4MP opens.

 -
the control light 2MP comes on.

-
the lever of the fill/overflow anddrain valve 8MA moves from the opento the closed position.

 -
the limit switch 3MP is de-energized.

 -
the motorized drain valve 4MP closes.

 -
the control light 2MP goes off.


 **ON A/C 001-049, 051-099, 101-149, 201-299, (Ref. Fig. 401/TASK 38-14-47-991-001) R **ON A/C 151-199, 301-399, 401-499, (Ref. Fig. 401A/TASK 38-14-47-991-001-A)

 **ON A/C ALL


 Subtask 38-14-47-410-050
 A. Close Access
 (1)
 Make sure that the work area is clean and clear of tool(s) and other items.

 (2)
 Install the access panel 161DW.

 (3)
 Close the AFT cargo-compartment door (Ref. TASK 52-30-00-860-002).

 (4)
 Close the access panel 171AL.


 (5) Remove the access platform(s). Subtask 38-14-47-613-050
 B. Do the servicing of the potable water system (Ref. TASK 12-16-38-613-001).
 Subtask 38-14-47-862-050
 C. De-energize the ground service network
 (Ref. TASK 24-42-00-862-001).

 1EFF : ALL 1 38-14-47Page 414 1 1 Aug 01/01R 1 1 1CES 1


 CONTROL CABLE AND HANDLE - OVERFLOW AND DRAIN VALVES (3260MM,3261MM)
____________________________________________________________________ REMOVAL/INSTALLATION
____________________
 TASK 38-14-48-000-001
 Removal of the Control Cable 3260MM (3261MM)
 1. Reason for the Job
__________________
 Self Explanatory
 2. Job Set-up Information
______________________
 A. Fixtures, Tools, Test and Support Equipment
 -------------------------------------------------------------------------------REFERENCE QTY DESIGNATION
 -------------------------------------------------------------------------------
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM WATER/WASTE 1(92)