_______ MATERIALS ONLY WITH A GOOD SUPPLY OF AIR. OBEY THE MANUFACTURERS INSTRUCTIONS. PUT ON PROTECTIVE CLOTHING. DO NOT GET THEM IN YOUR MOUTH. DO NOT SMOKE. DO NOT BREATHE THE GAS. THESE MATERIALS ARE POISONOUS, FLAMMABLE AND SKIN IRRITANT. GET MEDICAL HELP IF YOUR SKIN OR EYES BECOME IRRITATED.
 (a)
 Clean the struts with CLEANING AGENTS (Material No. 11-003).

 (b)
 Put the access panel-support struts (31) and (34) in position.

 (c)
 Install the nuts (33) and the bolts (32).


 (4)
 Operate the air condition system and make sure there are no leaks at the installed ducts (Ref. TASK 12-33-21-618-001).

 (5)
 Make sure that the work area is clean and clear of tool(s) and other items.

 (6)
 Installation of the access panels (Ref. Fig. 403/TASK 38-11-41-991-001)


 (a) Install the access panels 132PW, 131NW (Ref. TASK 25-54-12-400-001).
R 1EFF : 001-049, 051-099, 101-149, 201-299, 1 38-11-41Page 424 1 1 Aug 01/05 1 1 1CES 1


 (7)
 Remove the access platform(s).

 (8)
 Close the FWD cargo-compartment door (Ref. TASK 52-30-00-860-002).

 (9)
 De-energize the ground service network
 (Ref. TASK 24-42-00-862-001).

 


R **ON A/C 151-199, 301-399, 401-499,
 Subtask 38-11-41-410-051-A
 A. Close Access
 (1)
 Install the center support strut at FR65 (Ref. TASK 53-43-11-400-001) .

 (2)
 Make sure that the work area is clean and clear of tool(s) and other items.

 (3)
 Install the access panels 161DW, 162DW (Ref. TASK 25-55-12-400-001).

 (4)
 Remove the access platform(s).

 (5)
 Close the AFT cargo-compartment door (Ref. TASK 52-30-00-860-002).

 (6)
 De-energize the ground service network
 (Ref. TASK 24-42-00-862-001).

 

 

 TANK - WATER (3000MM) - INSPECTION/CHECK
________________________________________ TASK 38-11-41-200-001 R General Visual Inspection of the Potable Water Tank
 1.
 Reason for the Job

__________________
 Refer to the MPD TASK: 381000-02


 2.
 Job Set-up Information


______________________
 A. Referenced Information
 -------------------------------------------------------------------------------
REFERENCE DESIGNATION
 -------------------------------------------------------------------------------
24-41-00-861-002 Energize the Aircraft Electrical Circuits from the External Power 24-41-00-862-002 De-energize the Aircraft Electrical Circuits Supplied from the External Power 38-10-00-614-001 Pressurization of the Potable Water System from a
 Ground Air Supply 38-10-00-614-002 Depressurization of the Potable Water System 52-30-00-860-001 Open the FWD or AFT Cargo-Compartment Door with the
 Yellow Electric Pump 52-30-00-860-002 Close the FWD or AFT Cargo-Compartment Door with the Yellow Electric Pump
 3. Job Set-up
__________
 Subtask 38-11-41-861-051

 A. Energize the aircraft electrical circuits
 (Ref. TASK 24-41-00-861-002).

 (1) Put the access platform in position at the forward cargo compartment. Subtask 38-11-41-010-052
 B. Get Access
 (1)
 Open the Fwd Cargo compartment door (Ref. TASK 52-30-00-860-001).

 (2)
 Remove the access panels 131NW, 132PW.


R 1EFF : 001-049, 051-099, 101-149, 201-299, 1 38-11-41Page 601 1 1 May 01/05 1 1 1CES 1


 (3) Remove the insulation from around the tank. Subtask 38-11-41-614-050
 C. Pressurize the potable water system (Ref. TASK 38-10-00-614-001).
 4. Procedure
_________ Subtask 38-11-41-210-050
 A. Make a visual inspection of the potable water tank and make sure that:
 -there are no cracks leaks or damage.
 -
the distribution pipes are in good condition.

 -
the area around the tank is free of corrosion and is in a good condition.


 5. Close-up
________ Subtask 38-11-41-614-051
 A. If necessary depressurize the potable water system (Ref. TASK 38-10-00-614-002)
 Subtask 38-11-41-410-054
 B. Close Access
 (1)
 Install the insulation around the tank.

 (2)
 Install the access panels 131NW, 132PW.

 (3)
 Make sure that the work area is clean and clear of tool(s) and other items.

 (4)
 Close the FWD cargo compartment door (Ref. TASK 52-30-00-860-002).


 (5) Remove the access platform(s). Subtask 38-11-41-862-052
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM WATER/WASTE 1(35)