• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-03-25 12:19来源:蓝天飞行翻译 作者:admin
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

 * the ELEC page goes out of view and the DOOR/OXY page comes into view.
-On the upper ECAM DU:
 * FWS SDAC2 FAULT goes out of view.
 -after a few seconds, other cautions can come into view.
- on the upper ECAM DU:
* the MEMO indication comes into
 view. - on the lower ECAM DU:
 * the DOOR page comes into view.
- on the upper ECAM DU:
 * FWS SDAC1 FAULT comes into view.
-make sure that the cautions given in paragraph 1 come into view.
-the cautions given before go out of view.
-On the upper ECAM DU:
 * FWS SDAC1 FAULT goes out of view.
 1EFF : ALL 1 31-50-00Page 510 1 1 Feb 01/98 1 1 1CES 1


 5. Close-up
________ Subtask 31-50-00-860-055
 A. Put the aircraft back to its initial configuration.
 (1)
 On the ECAM control panel, set the UPPER DISPLAY and LOWER DISPLAY potentiometers to OFF.

 (2)
 De-energize the aircraft electrical circuits
 (Ref. TASK 24-41-00-862-002)


 (3)
 Make sure that the work area is clean and clear of tool(s) and other items.


 1EFF : ALL 1 31-50-00Page 511 1 1 Feb 01/98 1 1 1CES 1


 TASK 31-50-00-710-004 Operational Test of the ECAM Control Panel WARNING : MAKE SURE THAT ALL THE CIRCUITS IN MAINTENANCE ARE ISOLATED BEFORE
_______ YOU SUPPLY ELECTRICAL POWER TO THE AIRCRAFT.
 1.
 Reason for the Job

__________________
 Make sure that controls on the ECAM control panel operate correctly.


 2.
 Job Set-up Information


______________________
 A. Referenced Information
 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
24-41-00-861-002  Energize the Aircraft Electrical Circuits from the External Power 24-41-00-862-002 De-energize the Aircraft Electrical Circuits Supplied from the External Power 31-60-00-860-001 EIS Start Procedure
 3. Job Set-up
__________ Subtask 31-50-00-860-056
 A. Aircraft Maintenance Configuration
 (1)
 Energize the aircraft electrical circuits
 (Ref. TASK 24-41-00-861-002)


 (2)
 Do the EIS start procedure (Upper ECAM DU and lower ECAM DU only) (Ref. TASK 31-60-00-860-001)


 1EFF : ALL 1 31-50-00Page 512 1 1 Feb 01/98 1 1 1CES 1


 4. Procedure
_________ Subtask 31-50-00-710-054
 A. Test
 -------------------------------------------------------------------------------ACTION RESULT -------------------------------------------------------------------------------
1. On the overhead CTL & IND panel 20VU, on the ENG/APU FIRE panel 1WD:
 -Push the ENG 1 loop/squib TEST pushbutton switch.
On the ENG/APU FIRE panel 1WD:
 -
On the ENG 1 FIRE pushbutton switch, the ENG 1 FIRE legend comes on.

 -
On the applicable AGENT 1 and AGENT 2 pushbutton switches (related to the ENG 1 Fire pushbutton switch),the SQUIB and DISCH legends come on.


 On the ENG panel 115VU:
 -
The FIRE legend of the ENG 1 pushbutton switch comes on.

 On the glareshield panels 130VU and 131VU:

 -
The MASTER WARN lights flash on the Captain and First Officer sides.

 On the upper ECAM display unit (center instrument panel 4VU):

 -
The red ENG 1 FIRE indication comes into view.

 On the lower ECAM display unit (center instrument panel 4VU):

 -
The ENGINE page automatically comes into view.


 1EFF : ALL 1 31-50-00Page 513 1 1 Feb 01/98 1 1 1CES 1


 -------------------------------------------------------------------------------
ACTION RESULT -------------------------------------------------------------------------------
2. On the ECAM control panel:
 -push then release the EMER CANC pushbutton switch.
 3.
 Release the ENG 1 loop/squib TEST pushbutton switch.

 4.
 On the ECAM control panel:


 -
set a system page.

-
set again the same system page.


-
push and hold the ALL
pushbutton switch.


-
push then release the STS
pushbutton switch.

 

5. Push the STS pushbutton switch until the DOOR page comes into
 -The repetitive chime operates.
-the aural warning stops.
-All the above warnings go off.
-make sure that the system page set comes into view on the lower ECAM display unit.
 - on the ECAM control panel:
 * make sure that the light that relates to the system page set comes on.
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM 指示/记录系统 5(157)