R 1EFF : 001-049, 051-058, 101-101, 1 29-19-51Page 441 1 1 May 01/05 1 1 1CES 1
C. Expendable Parts -------------------------------------------------------------------------------
FIG.ITEM --------- |DESIGNATION ------------------------------------ |IPC-CSN----------------------------------
4 packings 29-19-51 01 -020
4 packings 29-19-51 02 -020
D. Referenced Information
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
20-28-00-912-004 Electrical Bonding of Components With Conductive
Bolts and Screws and Bonding Straps in the Fuselage
and in the Wings (this does not include the tanks)-
24-41-00-861-002 Energize the Aircraft Electrical Circuits from the
External Power
24-41-00-862-002 De-energize the Aircraft Electrical Circuits Supplied
from the External Power
29-00-00-910-002 Safety Procedures of the Hydraulic System
29-10-00-863-001 Pressurize the Green Hydraulic System
29-10-00-863-002 Pressurize the Yellow Hydraulic System
29-10-00-863-003 Pressurize the Blue Hydraulic System with a Ground
Power Supply
29-10-00-864-001 Depressurize the Green Hydraulic System
29-10-00-864-002 Depressurize the Yellow Hydraulic System
29-10-00-864-003 Depressurize the Blue Hydraulic System
29-14-00-614-002 Pressurization of the Hydraulic Reservoirs through
the Ground Connector
29-23-00-860-002 Connection of the Isolation Coupling of the Power
Transfer Unit (PTU)
31-60-00-860-001 EIS Start Procedure
31-60-00-860-002 EIS Stop Procedure
29-19-51-991-004 Fig. 404
29-19-51-991-005 Fig. 405
FOR FIN 1150GP
29-00-00-864-001 Put the Related Hydraulic System in the Depressurized
Configuration before Maintenance Action
29-14-00-614-001 Depressurization of the Hydraulic Reservoirs
29-23-00-860-001 Disconnection of the Isolation Coupling of the Power
Transfer Unit (PTU)
32-12-00-410-001 Close the Main Gear Doors after Access
FOR FIN 2150GP
R 1EFF : 001-049, 051-058, 101-101, 1 29-19-51Page 442 1 1 May 01/05 1 1 1CES 1 -------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
29-00-00-864-001 Put the Related Hydraulic System in the Depressurized
Configuration before Maintenance Action 29-14-00-614-001 Depressurization of the Hydraulic Reservoirs FOR FIN 3150GP 29-00-00-864-001 Put the Related Hydraulic System in the Depressurized
Configuration before Maintenance Action
29-14-00-614-001 Depressurization of the Hydraulic Reservoirs
3. Job Set-up
__________
Subtask 29-19-51-860-057
A. Aircraft Maintenance Configuration
WARNING : OBEY THE HYDRAULIC SAFETY PROCEDURES.
_______
(1)
Obey the hydraulic safety procedures (Ref. TASK 29-00-00-910-002).
(2)
Make sure that the container is in position below the replacement pilot valve .
R (3) FOR 1150GP
(a)
Make sure that the Green hydraulic system is depressurized and put it in the maintenance configuration (Ref. TASK 29-00-00-864-001).
(b)
Make sure that the reservoir of the Green hydraulic system is depressurized (Ref. TASK 29-14-00-614-001).
(c)
Make sure that the isolation coupling of the Power Transfer Unit (PTU) is disconnected (Ref. TASK 29-23-00-860-001).
(d)
Make sure that one MLG door is open.
(e)
Make sure that the access platform is in position.
(f)
Make sure that the warning notices are in position to tell persons not to pressurize the Green hydraulic system:
-in the cockpit on the hydraulic section 40VU of the overhead
panel. - on the ground service panel of the Green hydraulic system.
R 1EFF : 001-049, 051-058, 101-101, 1 29-19-51Page 443 1 1 May 01/05 1 1 1CES 1R (4) FOR 2150GP
(a)
Make sure that the Blue hydraulic system is depressurized and put it in the maintenance configuration (Ref. TASK 29-00-00-864-001).
(b)
Make sure that the reservoir of the Blue hydraulic system is depressurized (Ref. TASK 29-14-00-614-001).