• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-03-24 08:41来源:蓝天飞行翻译 作者:admin
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

At the RAT stowage area:
R 1EFF : 062-099, 106-149, 151-199, 204-299, 1 29-22-00Page 574 1301-399, 401-499, 1Config-1 Aug 01/05 1 1 1CES 1


 -------------------------------------------------------------------------------ACTION RESULT -------------------------------------------------------------------------------
-lift the guard and push the MAN ON/AUTO switch in the EMER ELEC PWR section.
Subtask 29-22-00-865-120

-
the RAT extends.On the glareshields:

 -
the MASTER CAUTION lights come on and you can hear a single chime.

 On the HYD page of the lower ECAM DU:

 -
the RAT triangle symbol changes to green when the RAT is fully extended.

 On the upper ECAM DU:

 -
the legends RAT FAULT and RAT OUT are shown in amber.


 B. Open, safety and tag this(these) circuit breaker(s):
 -------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------
121VU HYDRAULIC/RAT/SPLY/EXTN/SOL1 2803GE P33
 Subtask 29-22-00-210-080
 C. Inspection of the RAT:
 (1)
 Make sure that the RAT down lock is engaged.

 (a)
 Manually push the RAT in the retracted position.

 (b)
 If you push the RAT with a sudden force, the RAT can move in the retraction direction. This is permitted.

 (c)
 If you push the RAT with a constant force, the RAT can move in the retraction direction. This is not permitted, and you must remove the actuator (Ref. TASK 29-22-53-000-010) and (Ref. TASK 29-22-53-400-010).

 

 (2)
 Make sure that the RAT and the attachment parts are in the correct condition.


R 1EFF : 062-099, 106-149, 151-199, 204-299, 1 29-22-00Page 575 1301-399, 401-499, 1Config-1 Aug 01/05 1 1 1CES 1


 (3)
 Examine the oil level sight glass on the gear box housing (you must see oil on the sight glass). Add oil if necessary (Ref. TASK 12-13-29-600-001).

 (4)
 Do a check of the differential pressure indicator of the RAT filter:

 (a)
 Make sure that the differential pressure indicator is in.

 (b)
 If the the differential pressure indicator is out, replace the RAT filter element (Ref. TASK 29-22-51-000-013) and (Ref. TASK 29-22-51-400-013).

 

 (5)
 Make sure that the switch 28V DC on the RAT control panel is in the OFF position.


 Subtask 29-22-00-480-055
 D. Installation of the Ground Support Equipment (Ref. Fig. 509/TASK 29-22-00-991-023, 510/TASK 29-22-00-991-024, 511/TASK 29-22-00-991-030)
 (1) Install the CHECK - MOTOR GROUND, RAT (AGE10600C) to the RAT as follows:
 NOTE : If the CHECK - MOTOR GROUND, RAT (AGE10600C) is not available,
____ you can also use the subsequent check motors:
 -AGE10600A
 -Tronair AGE10600C
 -Testfuchs RATMK
 -Hycom HRT01.
 (a)
 Remove the bolts (3), the washers (2) and the cover plate (1).

 (b)
 Install the CHECK - MOTOR GROUND, RAT (4), the washers (2) and the bolts (3).

 (c)
 TORQUE the bolts (3) to between 86 and 95 lbf.in (0.97 and 1.07 m.daN).


R 1EFF : 062-099, 106-149, 151-199, 204-299, 1 29-22-00Page 576 1301-399, 401-499, 1Config-1 Aug 01/05 1 1 1CES 1


 Installation of the RAT Ground-Check Motor and Location of the RAT Indicators
 Figure 509/TASK 29-22-00-991-023

R 1EFF : 062-099, 106-149, 151-199, 204-299, 1 29-22-00Page 577 1301-399, 401-499, 1Config-1 Aug 01/05 1 1 1CES 1


 Installation of the RAT Ground-Checkout Unit and the Flow Control Test Kit
 Figure 510/TASK 29-22-00-991-024

R 1EFF : 062-099, 106-149, 151-199, 204-299, 1 29-22-00Page 578 1301-399, 401-499, 1Config-1 Aug 01/05 1 1 1CES 1


 Installation of the RAT Flow-Control Test Kit
 Figure 511/TASK 29-22-00-991-030

R 1EFF : 062-099, 106-149, 151-199, 204-299, 1 29-22-00Page 579 1301-399, 401-499, 1Config-1 Aug 01/05 1 1 1CES 1


 (d) Connect the hydraulic hoses of the CHECK - MOTOR GROUND, RAT to a hydraulic ground-power cart (reservoir capacity min. 150 l)..
 NOTE : The motor flow during the test is approximately 118 l.min
____ (31.1720 USgal.mn) +/- 8 l.min (2.1133 USgal.mn) at 206 bar (2987.7766 psi). To test the function of the RAT-governor, the motor flow will increase. Thus the capacity of the ground power cart must be 140 l.min (36.9837 USgal.mn) at 206 bar (2987.7766 psi). If the hydraulic ground-power cart has an adjustable flow control, it must be set to the max. flow during the complete test.
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM HYDRAULIC POWER 液压5(135)