• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-03-24 08:41来源:蓝天飞行翻译 作者:admin
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

 B. Referenced Information
 -------------------------------------------------------------------------------
REFERENCE DESIGNATION
 -------------------------------------------------------------------------------
29-00-00-864-001 Put the Related Hydraulic System in the Depressurized
 Configuration before Maintenance Action
 29-14-00-614-001 Depressurization of the Hydraulic Reservoirs
 29-14-41-991-003 Fig. 401

 

 3. Job Set-up
__________
 Subtask 29-14-41-865-055
 A. Open, safety and tag this(these) circuit breaker(s):
 -------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------49VU HYD/HYD PWR/B WARN/& CTL 2702GJ C12 121VU APU/APU/CTL 2KD L42 121VU APU/ECB/SPLY 1KD L41 121VU HYDRAULIC/HYD POWER/Y 3803GX N30 121VU HYDRAULIC/G HYD/PUMP ENG1/CTL 1701GK R35 121VU HYDRAULIC/G HYD/PUMP ENG1/MONG 1702GK R34 123VU B HYD/ELEC PUMP 2701GJ AB09 123VU Y HYD/ELEC/PUMP 3802GX AB06

R 123VU Y HYD/ELEC/ELEC PUMP/NORM 3801GX AB03
 Subtask 29-14-41-010-053
 B. Open the access panel 195BB.
 Subtask 29-14-41-860-056
 C. Aircraft Maintenance Configuration
 (1) Put the warning notices in position to tell persons not to pressurize the Green, Blue and Yellow hydraulic systems:
 -in the cockpit on the hydraulic section 40VU of the overhead panel,
 - on the ground service panel of the Green, Blue and Yellow hydraulic systems.
 (2)
 Make sure that the hydraulic systems are depressurized and put them in the maintenance configuration. (Ref. TASK 29-00-00-864-001).

 (3)
 Depressurize the reservoirs of the Green, Blue and Yellow hydraulic systems (Ref. TASK 29-14-00-614-001).

 (4)
 Put a container below the drain valve of the water separator.

 (5)
 Drain the fluid from the water separator into the container.

 (6)
 Remove the container.

 


 4. Procedure
_________ (Ref. Fig. 401/TASK 29-14-41-991-003) Subtask 29-14-41-020-052
 A. Removal of the Reservoir Pressurization Unit CAUTION : USE A SECOND WRENCH TO APPLY COUNTERTORQUE TO THE UNION WHEN
_______ YOU DISCONNECT/CONNECT HYDRAULIC LINES ON UNIONS. IF YOU USE THE SECOND WRENCH, YOU WILL NOT LOOSEN OR TIGHTEN THE UNION TOO MUCH.
 (1)
 Disconnect the lines (7), (4) and (2).

 (2)
 Put blanking plugs on the disconnected line ends.

 (3)
 Remove the nuts (6), the bolts (9) and the washers (8).

 (4)
 Remove the reservoir pressurization unit (1).

 


 Reservoir Pressurization Unit
 Figure 401/TASK 29-14-41-991-003
 1EFF :  ALL  1  29-14-41 Page 404 
1  1  Feb 01/98
 1  1
 1CES  1

 

 TASK 29-14-41-400-002
 Installation of the Reservoir Pressurization Unit (1360GM)
 WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
 GEAR.

 1. Reason for the Job
__________________
 Self Explanatory
 2. Job Set-up Information
______________________
 A. Fixtures, Tools, Test and Support Equipment
 -------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific warning notices
 No specific Torque Wrench : range 0.20 to 3.60 m.daN

 (2.00 to 26.00 lbf.ft)
 B. Consumable Materials
 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
R Material No. 02-003  F NSA 307110 TYPE 4 HYDRAULIC FLUID (PHOSPHATE ESTER BASE) (Ref. 20-31-00)
 Material No. 05-002 USA MIL-P-8116 PUTTY, ZINC CHROMATE GENERAL PURPOSE (Ref. 20-31-00) Material No. 05-004 USA MIL-L-25567 TYPE I OXYGEN LEAK DETECTOR (Ref. 20-31-00)
 Material No. 09-018  USA AMS 3267/3
 CORROSION INHIBITING LOW ADHESION SEALANT
 (Ref. 20-31-00)

 

 C. Referenced Information
 -------------------------------------------------------------------------------
REFERENCE  DESIGNATION
 -------------------------------------------------------------------------------
29-00-00-864-001 Put the Related Hydraulic System in the Depressurized
 Configuration before Maintenance Action 29-00-00-910-002 Safety Procedures of the Hydraulic System 29-14-00-614-001 Depressurization of the Hydraulic Reservoirs 29-14-00-614-002 Pressurization of the Hydraulic Reservoirs through
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM HYDRAULIC POWER 液压5(38)