• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-03-24 08:41来源:蓝天飞行翻译 作者:admin
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

 2. On the overhead panel 50VU:  In less than 15 s on the ECAM lower DU:
 - lift the guard and set the  - the color of the system name and
 HYD/LEAK MEASUREMENT VALVE / Y  system arrow changes to amber.
 pushbutton switch to OFF (the
 OFF light comes on).
 3. On the overhead panel 50VU:  On the ECAM lower DU:
 - lift the guard and set the  - the color of the system name changes
 HYD/LEAK MEASUREMENT VALVE / Y  to white,
 pushbutton switch to on (the  - the color of the system arrow changes
 OFF light goes off).  to green.

 (7)
 Depressurize the Yellow hydraulic system (Ref. TASK 29-10-00-864-002).

 (8)
 Do the EIS stop procedure
 (Ref. TASK 31-60-00-860-002).


 (9)
 De-energize the aircraft electrical circuits (Ref. TASK 24-41-00-862-002).


 5. Close-up
________ Subtask 29-19-51-860-053
 A. Put the system back to the serviceable condition.
 (1)
 Remove the container.

 (2)
 Connect the isolation coupling of the Power Transfer Unit (PTU) (Ref. TASK 29-23-00-860-002).


R 1EFF : 001-049, 051-058, 101-101, 1 29-19-51Page 432 1 1 May 01/05 1 1 1CES 1 Subtask 29-19-51-410-052


 B. Close Access
 (1)
 Make sure that the work area is clean and clear of tool(s) and other items.

 (2)
 Close the access panel 196BB.


R 1EFF : 001-049, 051-058, 101-101, 1 29-19-51Page 433 1 1 May 01/05 1 1 1CES 1 TASK 29-19-51-000-004


 Removal of the Pilot Valves of the Leakage-Measurement Solenoid Valves
 WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROL SURFACES ARE
_______ CLEAR BEFORE YOU PRESSURIZE/DEPRESSURIZE A HYDRAULIC SYSTEM.
 WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______ GEAR.
 WARNING : OBEY THE HYDRAULIC SAFETY PROCEDURES.
_______
 1. Reason for the Job
__________________
 Self Explanatory
 2. Job Set-up Information
______________________
 A. Fixtures, Tools, Test and Support Equipment
 -------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific blanking caps No specific blanking plugs No specific circuit breaker(s) safety clip(s) No specific container FOR FIN 1150GP No specific warning notices No specific access platform 3.0 m (9 ft. 10 in.) FOR FIN 2150GP No specific warning notices FOR FIN 3150GP No specific warning notices
R 1EFF : 001-049, 051-058, 101-101, 1 29-19-51Page 434 1 1 May 01/05 1 1 1CES 1 B. Referenced Information


 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
29-19-51-991-004 Fig. 404 29-19-51-991-005 Fig. 405 FOR FIN 1150GP 29-00-00-864-001 Put the Related Hydraulic System in the Depressurized
 Configuration before Maintenance Action 29-14-00-614-001 Depressurization of the Hydraulic Reservoirs 29-23-00-860-001 Disconnection of the Isolation Coupling of the Power
 Transfer Unit (PTU) 32-12-00-010-001 Open the Main Gear Doors for Access FOR FIN 2150GP 29-00-00-864-001 Put the Related Hydraulic System in the Depressurized
 Configuration before Maintenance Action 29-14-00-614-001 Depressurization of the Hydraulic Reservoirs FOR FIN 3150GP 29-00-00-864-001 Put the Related Hydraulic System in the Depressurized
 Configuration before Maintenance Action
 29-14-00-614-001 Depressurization of the Hydraulic Reservoirs

 3. Job Set-up
__________
 Subtask 29-19-51-865-059
 A. Open, safety and tag this(these) circuit breaker(s):
 -------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------
121VU HYDRAULIC/SOL VALVES/G/Y/B/LEAK/TST 1881GP N35
 Subtask 29-19-51-010-053
 B. Get Access

R (1) FOR 1150GP
 (a)
 Open one main door of the main gear (Ref. TASK 32-12-00-010-001).

 (b)
 Put the access platform in position.


R 1EFF : 001-049, 051-058, 101-101, 1 29-19-51Page 435 1 1 May 01/05 1 1 1CES 1


R  (2) FOR 2150GP
 (a) Open the access panel 195BB. 
R  (3) FOR 3150GP
 (a) Open the access panel 196BB.
 Subtask 29-19-51-860-056
 C. Aircraft Maintenance Configuration 
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM HYDRAULIC POWER 液压5(87)