 Make sure that the work area is clean and clear of tool(s) and other items.

 (2)
 Close the right main door of the main gear (Ref. TASK 32-12-00-410-001).

 (3)
 Close the access door 196BB of the belly fairing.

 


 TANK - COLLECTOR - REMOVAL/INSTALLATION
_______________________________________ TASK 29-17-11-000-001 Removal of the Collector Tanks of the Seal Drain System
 1.
 Reason for the Job

__________________
 Self Explanatory


 2.
 Job Set-up Information


______________________
 A. Fixtures, Tools, Test and Support Equipment
 -------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific blanking plugs No specific container
 B. Referenced Information
 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
29-00-00-910-002 Safety Procedures of the Hydraulic System 32-12-00-010-001 Open the Main Gear Doors for Access 29-17-11-991-001 Fig. 401
 3. Job Set-up
__________ Subtask 29-17-11-010-050
 A. Get Access
 (1)
 Open the access door 196BB.

 (2)
 Open the right main door of the main gear (Ref. TASK 32-12-00-010-001).

 


 Subtask 29-17-11-941-050
 B. Safety Precautions
 WARNING : OBEY THE HYDRAULIC SAFETY PROCEDURES.

_______
 (1)
 Obey the hydraulic safety procedures (Ref. TASK 29-00-00-910-002).

 (2)
 Put a container below the applicable collector tank.


 4. Procedure
_________
 (Ref. Fig. 401/TASK 29-17-11-991-001) Subtask 29-17-11-020-050
 A. Removal of the Collector Tank
 (1)
 Disconnect the pipe end-fitting (1) from the collector tank (3).

 (2)
 Release the clamp (2).

 (3)
 Remove the collector tank (3).

 (4)
 Put blanking plugs on the disconnected line ends.

 


 Collector Tank
 Figure 401/TASK 29-17-11-991-001
 1EFF :  ALL  1  29-17-11 Page 403 
1  1  Feb 01/98
 1  1
 1CES  1

 

 TASK 29-17-11-400-001 Installation of the Collector Tanks of the Seal Drain System
 1. Reason for the Job
__________________
 Self Explanatory
 2. Job Set-up Information
______________________
 A. Fixtures, Tools, Test and Support Equipment
 -------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific container
 B. Referenced Information
 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
29-00-00-910-002 Safety Procedures of the Hydraulic System 32-12-00-010-001 Open the Main Gear Doors for Access 32-12-00-410-001 Close the Main Gear Doors after Access 29-17-11-991-001 Fig. 401
 3. Job Set-up
__________
 (Ref. Fig. 401/TASK 29-17-11-991-001) Subtask 29-17-11-860-050
 A. Aircraft Maintenance Configuration
 WARNING : OBEY THE HYDRAULIC SAFETY PROCEDURES.

_______
 (1)
 Obey the hydraulic safety procedures (Ref. TASK 29-00-00-910-002).

 (2)
 Make sure that the access door 196BB is open.

 (3)
 Make sure that the right main door of the main gear is open (Ref. TASK 32-12-00-010-001).

 (4)
 Make sure that the container is in position below the location of the

 

 

 collector tank.
 _________

4. Procedure
 Subtask 29-17-11-420-050
 A. Installation of the Collector Tank
 (1)
 Clean the component interface and/or the adjacent area.

 (2)
 Do an inspection of the component interface and/or the adjacent area.

 (3)
 Remove the blanking plugs.

 (4)
 Put the collector tank (3) in position.

 (5)
 Engage and close the clamp (2).

 (6)
 Make sure that the hydraulic line end-fittings are serviceable.

 (7)
 Connect the pipe end-fitting (1) to the collector tank (3).


 