On each reservoir air pressure gage:
-
the pressure in the reservoir stays constant at 50 psi (3.4473 bar).
(1)
Make sure that the work area is clean and clear of tool(s) and other items.
(2)
Close the right main door of the main landing gear (Ref. TASK 32-12-00-410-001).
(3)
Close the access doors 196BB, 197CB, 197EB, 197FB, 198CB.
1EFF : ALL 1 29-14-00Page 511 1 1 May 01/05R 1 1 1CES 1
(4) Remove the warning notices from:
-
the flight compartment,
-
the ground service panels of the Green, Yellow and Blue hydraulic systems.
Subtask 29-14-00-865-062
B. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s): 2701GJ, 3801GX, 3802GX, 3803GX, 3700GD, 3701GD, 1701GK, 1702GK.
1EFF : ALL 1 29-14-00Page 512 1 1 May 01/05R 1 1 1CES 1
TASK 29-14-00-280-001
Test of the Air Relief Valves,the Reservoir Pressure Check Valves,the Pressure Gages and the Automatic Drain Valve of the Reservoir Pressurizing System
1. Reason for the Job
__________________
Self Explanatory
2. Job Set-up Information
______________________
A. Fixtures, Tools, Test and Support Equipment
-------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific adapter hose No specific blanking cap No specific blanking plugs No specific circuit breaker(s) safety clip(s) No specific warning notices No specific container 3.0 l (0.7925 USgal) No specific Torque Wrench : range 0.20 to 3.60 m.daN
(2.00 to 26.00 lbf.ft) No specific Torque Wrench : range 1.00 to 10.00 m.daN
(8.00
to 75.00 lbf.ft) 98D29003501000 1 FILL UNIT - AIR
B.
Referenced Information
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
12-12-29-611-001 Fill the Hydraulic Fluid Reservoir with a Hand Pump 12-12-29-611-002 Fill the Hydraulic Fluid Reservoir with a Hydraulic Service Cart 29-00-00-864-001 Put the Related Hydraulic System in the Depressurized
Configuration before Maintenance Action 29-00-00-910-002 Safety Procedures of the Hydraulic System 29-10-00-680-001 Drainage of the Reservoir of the Green Hydraulic
System 29-10-00-680-002 Drainage of the Reservoir of the Yellow Hydraulic System 29-10-00-680-003 Drainage of the Reservoir of the Blue Hydraulic System
1EFF : ALL 1 29-14-00Page 513 1 1 May 01/05R 1 1 1CES 1
-------------------------------------------------------------------------------
REFERENCE DESIGNATION -------------------------------------------------------------------------------
29-11-41-000-001 Removal of the Green Hydraulic Reservoir
29-11-41-400-001 Installation of the Green Hydraulic Reservoir
29-12-41-000-001 Removal of the Blue Hydraulic Reservoir
29-12-41-400-001 Installation of the Blue Hydraulic Reservoir
29-13-41-000-002 Removal of the Yellow Hydraulic Reservoir
29-13-41-400-002 Installation of the Yellow Hydraulic Reservoir
29-14-00-614-001 Depressurization of the Hydraulic Reservoirs
29-14-17-000-001 Removal of the Air Relief Valve of the Green
Hydraulic System (1005GM) 29-14-17-000-002 Removal of the Air Relief Valve of the Blue Hydraulic System (2005GM) 29-14-17-000-003 Removal of the Air Relief Valve of the Yellow Hydraulic System (3005GM) 29-14-17-400-001 Installation of the Air Relief Valve of the Green Hydraulic System (1005GM) 29-14-17-400-002 Installation of the Air Relief Valve of the Blue
Hydraulic System (2005GM)
29-14-17-400-003 Installation of the Air Relief Valve of the Yellow
Hydraulic System (3005GM)
29-14-18-000-001 Removal of the Reservoir Pressure Check Valves (1388GM,2388GM,3388GM) 29-14-18-400-001 Installation of the Reservoir Pressure Check Valves (1388GM,2388GM,3388GM) 36-12-00-710-001 Operational Test of the APU Bleed Air Supply and
Crossbleed Systems
49-00-00-860-003 APU Start by External Power (GTCP 36-300)
49-00-00-860-004 APU Shutdown by External Power (GTCP 36-300)
49-00-00-860-005 APU Start by External Power (APS 3200)
49-00-00-860-006 APU Shutdown by External Power (APS 3200)
49-00-00-860-008 APU Start by External Power (131-9(A))
49-00-00-860-009 APU Shutdown by External Power (131-9(A))
29-14-00-991-005 Fig. 501