(2)
Put the container in position below the leakage-measurement solenoid valve (referred to as solenoid valve) to collect the hydraulic fluid.
4. Procedure
_________
(Ref. Fig. 401/TASK 29-19-51-991-003) Subtask 29-19-51-020-053
A. Removal of the Solenoid Valve 1150GP
(1)
Disconnect the electrical connector (1).
(2)
Put blanking caps on the disconncted electrical connector (1) and on the receptacle.
(3)
Remove the nut (2), the washer (3), the bolt (4) and the bonding strap (5) from the solenoid valve (6).
(4)
Hold the solenoid valve (6) and remove the three bolts (7) and the washers (8).
(5)
Remove the solenoid valve (6).
(6)
Remove the bobbins (10), (11) (Ref. TASK 20-23-21-911-001).
(7)
Install blanking plugs in the open ports of the manifold (13) and the solenoid valve (6).
(8)
Remove and discard the square-section seals (16), (21), the O-rings (18), (19) and the back-up rings (17), (9), (20), (12).
R 1EFF : 001-049, 051-058, 101-101, 1 29-19-51Page 403 1 1 May 01/05 1 1 1CES 1
Leakage Measurement Solenoid Valve
Figure 401/TASK 29-19-51-991-003
R 1EFF : 001-049, 051-058, 101-101, 1 29-19-51Page 404 1 1 May 01/05 1 1 1CES 1
TASK 29-19-51-400-001 Installation of the Leakage-Measurement Solenoid Valve (1150GP) WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROL SURFACES ARE
_______
CLEAR BEFORE YOU PRESSURIZE/DEPRESSURIZE A HYDRAULIC SYSTEM.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
1.
Reason for the Job
__________________
Self Explanatory
2.
Job Set-up Information
______________________
A. Fixtures, Tools, Test and Support Equipment
-------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific container
No specific warning notices
No specific access platform 3.0 m (9 ft. 10 in.)
R No specific Torque Wrench : range 0.00 to 1.20 m.daN
R (0.00 to 9.00 lbf.ft)
B. Consumable Materials
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
Material No. 02-003 F NSA 307110 TYPE 4
HYDRAULIC FLUID (PHOSPHATE ESTER BASE)
(Ref. 20-31-00)
R 1EFF : 001-049, 051-058, 101-101, 1 29-19-51Page 405 1 1 May 01/05 1 1 1CES 1 C. Expendable Parts
-------------------------------------------------------------------------------FIG.ITEM |DESIGNATION |IPC-CSN -------------------------------------------------------------------------------
9 back-up ring 29-11-14 02B-120
12 back-up rings 29-11-14 02B-170
16 square-section seal 29-11-14 02B-140
17 back-up ring 29-11-14 02B-130
18 O-ring 29-11-14 02B-110
19 O-rings 29-11-14 02B-160
20 back-up rings 29-11-14 02B-180
21 square-section seals 29-11-14 02B-190
D. Referenced Information
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
20-23-21-911-001 Removal/Installation of the Bobbins from their
Housings and Installation of O-rings, Square Seals,
and Back-up Rings on the Bobbins
20-28-00-912-004 Electrical Bonding of Components With Conductive
Bolts and Screws and Bonding Straps in the Fuselage
and in the Wings (this does not include the tanks)-
24-41-00-861-002 Energize the Aircraft Electrical Circuits from the
External Power
24-41-00-862-002 De-energize the Aircraft Electrical Circuits Supplied
from the External Power
29-00-00-864-001 Put the Related Hydraulic System in the Depressurized
Configuration before Maintenance Action
29-00-00-910-002 Safety Procedures of the Hydraulic System
29-10-00-863-001 Pressurize the Green Hydraulic System
29-10-00-864-001 Depressurize the Green Hydraulic System
29-14-00-614-001 Depressurization of the Hydraulic Reservoirs
29-14-00-614-002 Pressurization of the Hydraulic Reservoirs through
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM HYDRAULIC POWER 液压5(78)