(2)
Energize the aircraft electrical circuits (Ref. TASK 24-41-00-861-002).
R 1EFF : 001-049, 051-061, 101-105, 201-203, 1 29-22-00Page 537 1 1 Config-1 May 01/05 1 1 1CES 1 Subtask 29-22-00-010-060
B. Open the access door 197EB.
Subtask 29-22-00-865-063
C. Make sure that this(these) circuit breaker(s) is(are) closed:
-------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------106VU CSM/G /EV/MAN/SPLY 6XE B04 121VU HYDRAULIC/RAT/SPLY/EXTN/SOL1 2803GE P33
R **ON A/C 001-049, 051-061, 101-102, 201-202,
121VU HYDRAULIC/RAT/CTL 2801GE P32 R **ON A/C 103-105, 203-203,
121VU HYD/RAT/CTL 2801GE P32 R **ON A/C 001-049, 051-061, 101-105, 201-203,
Subtask 29-22-00-865-064
D. Open, safety and tag this(these) circuit breaker(s):
-------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------
105VU ELEC/CSM/G /EV AUTO/SPLY 7XE C01
Subtask 29-22-00-860-078
E. Aircraft Maintenance Configuration
(1)
Do the EIS start procedure (Ref. TASK 31-60-00-860-001).
(2)
On the ECAM control panel on the center pedestal, press the HYD pushbutton switch (P/BSW). Make sure that the HYD page is shown on the ECAM lower DU.
R 1EFF : 001-049, 051-061, 101-105, 201-203, 1 29-22-00Page 538 1 1 Config-1 May 01/05 1 1 1CES 1
(3) Make sure that on the HYD page the RAT triangle symbol is displayed in white.
4. Procedure
_________ (Ref. Fig. 508/TASK 29-22-00-991-002) Subtask 29-22-00-710-054
A. Operational Test
WARNING : MAKE SURE THAT THE RAT TRAVEL RANGE IS CLEAR BEFORE YOU
_______
EXTEND/RETRACT THE RAT.
NOTE : Make sure that a second person examines the extension of the RAT
____
before you push the RAT MAN ON pushbutton.
NOTE : Do not operate the RAT deployment solenoids for more than 60
____ seconds. You can operate them more than once during the test. When the total operation time (solenoid energized) is 60 seconds, you must let the solenoids cool for 30 minutes.
(1) Do this test
-------------------------------------------------------------------------------ACTION RESULT -------------------------------------------------------------------------------
1. On the overhead panel 40VU: At the RAT stowage area:
-lift the guard and push the RAT - the RAT deploys.
MAN ON switch.
On the glareshields:
-
the MASTER CAUTION lights come on and you can hear a single chime.
On the HYD page of the lower ECAM DU:
-
the RAT triangle symbol changes to amber while the RAT deploys.
At the RAT stowage area:
-
the RAT is fully deployed,
R 1EFF : 001-049, 051-061, 101-105, 201-203, 1 29-22-00Page 539 1 1 Config-1 May 01/05 1 1 1CES 1
-------------------------------------------------------------------------------
ACTION RESULT -------------------------------------------------------------------------------
2.
Pressurize the Blue hydraulic system (Ref. TASK 29-10-00-863-003).
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM HYDRAULIC POWER 液压5(123)