Energize the aircraft electrical circuits (Ref. TASK 24-41-00-861-002).
R 1EFF : 001-049, 051-061, 101-105, 201-203, 1 29-22-00Page 546 1 1 Config-1 May 01/05 1 1 1CES 1
R Subtask 29-22-00-010-058
R B. Open the access door 197EB.
Subtask 29-22-00-865-052
R C. Make sure that this(these) circuit breaker(s) is(are) closed:
R -------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------106VU CSM/G /EV/MAN/SPLY 6XE B04 121VU HYDRAULIC/RAT/SPLY/EXTN/SOL1 2803GE P33
R **ON A/C 001-049, 051-061, 101-102, 201-202,
R 121VU HYDRAULIC/RAT/CTL 2801GE P32
R **ON A/C 103-105, 203-203,
R 121VU HYD/RAT/CTL 2801GE P32
R **ON A/C 001-049, 051-061, 101-105, 201-203,
Subtask 29-22-00-865-055
R D. Open, safety and tag this(these) circuit breaker(s):
-------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------105VU ELEC/CSM/G /EV AUTO/SPLY 7XE C01
R 1EFF : 001-049, 051-061, 101-105, 201-203, 1 29-22-00Page 547 1 1 Config-1 May 01/05 1 1 1CES 1
4. Procedure
_________ R (Ref. Fig. 508/TASK 29-22-00-991-002) Subtask 29-22-00-710-053
A. Operational Test WARNING : MAKE SURE THAT THE RAT TRAVEL RANGE IS CLEAR BEFORE YOU
_______
EXTEND/RETRACT THE RAT.
NOTE : Make sure that a second person examines the extension of the RAT
____
before you push the RAT MAN ON pushbutton.
NOTE : Do not operate the RAT deployment solenoids for more than 60
____ seconds. You can operate them more than once during the test. When the total operation time (solenoid energized) is 60 seconds, you must let the solenoids cool for 30 minutes.
(1) Do this test
-------------------------------------------------------------------------------ACTION RESULT -------------------------------------------------------------------------------
1. On the overhead panel 40VU:
-lift the cover and push the RAT - the RAT extends.
MAN ON switch.
2.
Retract the RAT (Ref. TASK 29-22- - the RAT returns to its stowage.
00-869-002).
3.
On the overhead panel 21VU:
-lift the cover and push the MAN - the RAT extends.
ON/AUTO switch in the EMER ELEC
PWR section.
Subtask 29-22-00-210-059
B. Visual Inspection
(1)
Visually inspect the electrical harness of the RAT for damage.
(2)
Make sure that the clogging indicator of the RAT filter is not popped out.
R 1EFF : 001-049, 051-061, 101-105, 201-203, 1 29-22-00Page 548 1 1 Config-1 May 01/05 1 1 1CES 1
Subtask 29-22-00-860-080
C. Preparation for the Test
(1) Install the PROTECTION EQUIPMENT - RAT (98D29207550001).
R (2) Connect the CONTROL UNIT - RAT (682003008) to the ground test
R connector of the RAT ground control-panel 2815GE.
R
R (3) Pressurize the Blue hydraulic system with the ground power cart
(Ref. TASK 29-10-00-863-003).
R NOTE : For the test of the function of the RAT-governor with the____
R overspeed protection, a system flow (dynamic) of 95 l.min
R (25.0961 USgal.mn) at 206 bar (2987.7766 psi) is necessary.
R Thus, the capacity of the ground power cart must be not less
than 130 l.min (34.3420 USgal.mn) at 206 bar (2987.7766 psi).
R (4) On the maintenance panel 50VU, set the HYD/LEAK MEASUREMENT VALVES/B
R pushbutton switch to the OFF position.
R (5) Do the EIS start procedure (Upper ECAM DU and lower ECAM DU only)
(Ref. TASK 31-60-00-860-001).
R (6) On the ECAM control panel on the center pedestal, push the HYD
pushbutton. Make sure that the HYD page on the lower ECAM DU comes
into view.
R
Subtask 29-22-00-720-050
D. Do this test:
R
R (1) Make sure that the pressure of the ground power cart is not less than
R 206 +3 -0 bar (2987.7766 +43.5113 -0.0000 psi).
R
R (2) Make sure that the flow from the ground power cart is not less than
R 95 l.min (25.0961 USgal.mn).
R (3) Make sure that the by-pass of the ground power cart is fully closed.