 4. Procedure_________
 (Ref. Fig. 402/TASK 29-14-41-991-005)
 Subtask 29-14-41-420-054
 A. Installation of the Outlet Non-Return Valve of the Reservoir
 Pressurization Unit (1360GM)

 CAUTION : USE A SECOND WRENCH TO APPLY COUNTERTORQUE TO THE UNION WHEN
_______ YOU DISCONNECT/CONNECT HYDRAULIC LINES ON UNIONS. IF YOU USE THE SECOND WRENCH, YOU WILL NOT LOOSEN OR TIGHTEN THE UNION TOO MUCH.
 (1)
 Clean the component interface and/or the adjacent area.

 (2)
 Do an inspection of the component interface and/or the adjacent area.

 (3)
 Remove the blanking plug from the port of the reservoir
 pressurization unit (3).


 (4)
 Apply HYDRAULIC FLUIDS (Material No. 02-003) to the threads and O-rings of the outlet non-return valve (2).

 (5)
 Install the outlet non-return valve (2) in the reservoir
 pressurization unit (3).

 

 1EFF : ALL 1 29-14-41Page 418 1 1 May 01/05R 1 1 1CES 1


 (6)
 TORQUE the outlet non-return valve (2) to between 1.1 and 1.25 m.daN

 (97.34 and 110.61 lbf.in).

 (7)
 Remove the blanking plug from the line end (1).

 (8)
 Make sure that the line end-fitting is serviceable.

 (9)
 Apply HYDRAULIC FLUIDS (Material No. 02-003) to the threads of the line end-fitting.


 (10)
 Connect the line (1) to the outlet non-return valve (2).

 (11)
 TORQUE the union nut of the line (1) to between 1.5 and 1.7 m.daN


 (11.06
 and 12.53 lbf.ft).
 Subtask 29-14-41-865-061


 B.
 Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s): 1KD, 2KD, 1701GK, 1702GK, 2701GJ, 2702GJ, 3801GX, 3802GX, 3803GX.

 

R **ON A/C 001-049, 101-105, 151-199, 201-210,
 Subtask 29-14-41-790-055-A
 C. Test of the Outlet Non-Return Valve NOTE : Do a leak test on the outlet non-return valve (2) with the air
____ pressure supplied from both a ground supply and the low pressure air bleed. Do the test at the same time as the pressure is supplied.
 (1)
 Start the aircraft APU (Ref. TASK 49-00-00-860-008).

 (2)
 Make sure that the bleed air supply from the APU is set to supply the reservoir pressurizing system (Ref. TASK 36-12-00-710-001).

 (3)
 Apply SPECIAL MATERIALS (Material No. 05-004) to the these connections:

 -The line (1) and the outlet non-return valve (2),
 -the reservoir pressurization unit (3) and the outlet non-return valve (2).

 (4)
 Make sure that there is no leak.

 (5)
 Stop the operation of the aircraft APU (Ref. TASK 49-00-00-860-009).

 


 (6) Pressurize the reservoirs of the Green, Blue and Yellow hydraulic
 systems (Ref. TASK 29-14-00-614-002).
 (7) Examine these connections and make sure that there is no leak:
 - The line (1) and the outlet non-return valve (2),
 - the reservoir pressurization unit (3) and the outlet non-return
 valve (2). 
R  **ON A/C 051-099, 
R  Subtask 29-14-41-790-055 
R  C. Test of the Outlet Non-Return Valve 
R  NOTE : Do a leak test on the outlet non-return valve (2) with the air____ 
R  pressure supplied from both a ground supply and the low pressure 
R  air bleed. Do the test at the same time as the pressure is 
R  supplied. 
R  (1) Start the aircraft APU (Ref. TASK 49-00-00-860-003). 
R  (2) Make sure that the bleed air supply from the APU is set to supply the 
R  reservoir pressurizing system (Ref. TASK 36-12-00-710-001). 
R  (3) Apply SPECIAL MATERIALS (Material No. 05-004) to the these 
R  connections: 
R  - The line (1) and the outlet non-return valve (2), 
R  - the reservoir pressurization unit (3) and the outlet non-return 
R  valve (2). 
R  (4) Make sure that there is no leak. 
R  (5) Stop the operation of the aircraft APU (Ref. TASK 49-00-00-860-004). 
R  (6) Pressurize the reservoirs of the Green, Blue and Yellow hydraulic 
R  systems (Ref. TASK 29-14-00-614-002). 
R  (7) Examine these connections and make sure that there is no leak: 
R  - The line (1) and the outlet non-return valve (2), 
R  - the reservoir pressurization unit (3) and the outlet non-return 
R  valve (2). 


 