 **ON A/C 001-003, 051-054,
 29-14-00-991-006 Fig. 502
R **ON A/C 004-049, 055-099, 101-149, 151-199, 201-299, 301-399, 401-499,
 29-14-00-991-006-A Fig. 502A -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------


**ON A/C ALL
 29-14-00-991-007 Fig. 503
 3. Job Set-up
__________
 Subtask 29-14-00-865-067
 A. Open, safety and tag this(these) circuit breaker(s):
 -------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------123VU B HYD/ELEC PUMP 2701GJ AB09 123VU Y HYD/ELEC/PUMP 3802GX AB06 123VU Y HYD/ELEC/ELEC PUMP/NORM 3801GX AB03
 Subtask 29-14-00-860-060
 B. Aircraft Maintenance Configuration
 WARNING : OBEY THE HYDRAULIC SAFETY PROCEDURES.
_______
 (1)
 Obey the hydraulic safety procedures (Ref. TASK 29-00-00-910-002).

 (2)
 Depressurize the Green, Yellow and Blue hydraulic systems and put them in the maintenance configuration (Ref. TASK 29-00-00-864-001).

 (3)
 Put warning notices to tell persons not to pressurize the hydraulic systems:


 -in the flight compartment near the hydraulic section 40VU of the overhead panel,
 - on the ground service panels of the Green, Yellow and Blue hydraulic systems.
 (4) Depressurize the reservoirs of the Green, Yellow and Blue hydraulic systems. (Ref. TASK 29-14-00-614-001).
 1EFF : ALL 1 29-14-00Page 515 1 1 May 01/05R 1 1 1CES 1


 (5)
 Drain the reservoirs of the Green, Yellow and Blue hydraulic systems.

 -
For the Green hydraulic system (Ref. TASK 29-10-00-680-001).

 -
For the Yellow hydraulic system (Ref. TASK 29-10-00-680-002).

 -
For the Blue hydraulic system (Ref. TASK 29-10-00-680-003).

 

 (6)
 Open the access door 195BB.


 4. Procedure
_________
 (Ref. Fig. 501/TASK 29-14-00-991-005)
 **ON A/C 001-003, 051-054,

 (Ref. Fig. 502/TASK 29-14-00-991-006) R **ON A/C 004-049, 055-099, 101-149, 151-199, 201-299, 301-399, 401-499,
 (Ref. Fig. 502A/TASK 29-14-00-991-006-A)
 **ON A/C ALL

 (Ref. Fig. 503/TASK 29-14-00-991-007)
 Subtask 29-14-00-320-050

 A. Manufacturing of the Test Manifold
 (1)
 If not available make a test manifold.
 (Ref. Fig. 501/TASK 29-14-00-991-005)


 (2)
 Connect a flexible hose (2) with a length of approximately 1.0 m

 (3.28 ft.) to the test manifold (3).

 (3)
 Connect a calibrated pressure gage (1) with a range to 10.0 bar (145.0377 psi) to the hose (2).

 (4)
 Install a gas-charging valve (5) with a packing (4) in the test manifold (3).

 


 Test Manifold Figure 501/TASK 29-14-00-991-005 
R 1EFF : 1 1 1CES  ALL  1 111 29-14-00 Page 517 May 01/05

 

 Installation of the Test Equipment at the Hydraulic Reservoirs
 Figure 502/TASK 29-14-00-991-006

R 1EFF : 001-003, 051-054, 1 29-14-00Page 518 1 1 May 01/05 1 1 1CES 1


 Installation of the Test Equipment at the Hydraulic Reservoirs
 Figure 502A/TASK 29-14-00-991-006-A

R 1EFF : 004-049, 055-099, 101-149, 151-199, 1 29-14-00Page 519 1201-299, 301-399, 401-499, 1Aug 01/05 1 1 1CES 1


 Reservoir Pressurization Unit Figure 503/TASK 29-14-00-991-007
 1EFF : 1 1R 1CES  ALL  1 11 1 29-14-00 Page 520 May 01/05

 

 Subtask 29-14-00-480-050
 B. Test Preparation CAUTION : USE A SECOND WRENCH TO APPLY COUNTERTORQUE TO THE UNION WHEN
_______ YOU DISCONNECT/CONNECT HYDRAULIC LINES ON UNIONS. IF YOU USE THE SECOND WRENCH, YOU WILL NOT LOOSEN OR TIGHTEN THE UNION TOO MUCH.
 (1)
 Disconnect the air supply line (20) from the reservoir pressurization unit (21).

 (2)
 Install a blanking cap on the open port at the reservoir
 pressurization unit (21).


 (3)
 Put the open end of the air supply line (20) in a container.

 (4)
 Fill the container with water so that the end of the air supply line


 (20)
 is under water. Subtask 29-14-00-280-050

 C.
 Test of the Air Relief Valve (1005GM), the Reservoir Pressure Check Valve (1388GM) and the Reservoir Pressure Gage (1383GM) of the Green Hydraulic Reservoir Pressurizing System


 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM HYDRAULIC POWER 液压5(3)