(5)
Remove the container.
Subtask 29-14-42-010-050
D. Open the access panel 195BB.
4. Procedure
_________
(Ref. Fig. 401/TASK 29-14-42-991-001) Subtask 29-14-42-020-050
A. Removal of the Water Separator
(1)
Hold the water separator (3) and remove the bolts (4).
(2)
Disengage the water separator (3) from the reservoir pressurization unit (2).
(3)
Remove and discard the packings (5) and (6).
Water Separator
Figure 401/TASK 29-14-42-991-001
1EFF : ALL 1 29-14-42 Page 404
1 1 Feb 01/98
1 1
1CES 1
TASK 29-14-42-400-001
Installation of the Hydraulic Fluid Separator
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
1. Reason for the Job
__________________
Self Explanatory
2. Job Set-up Information
______________________
A. Fixtures, Tools, Test and Support Equipment
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
No specific warning notices
B. Consumable Materials
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
R Material No. 02-003 F NSA 307110 TYPE 4 HYDRAULIC FLUID (PHOSPHATE ESTER BASE) (Ref. 20-31-00) Material No. 05-004 USA MIL-L-25567 TYPE I OXYGEN LEAK DETECTOR (Ref. 20-31-00)
C. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
29-00-00-864-001 Put the Related Hydraulic System in the Depressurized
Configuration before Maintenance Action 29-00-00-910-002 Safety Procedures of the Hydraulic System 29-14-00-614-001 Depressurization of the Hydraulic Reservoirs 29-14-00-614-002 Pressurization of the Hydraulic Reservoirs through
the Ground Connector
29-14-42-991-001 Fig. 401
3. Job Set-up
__________
Subtask 29-14-42-860-051
A. Aircraft Maintenance Configuration
WARNING : OBEY THE HYDRAULIC SAFETY PROCEDURES.
_______
(1)
Obey the hydraulic safety procedures (Ref. TASK 29-00-00-910-002).
(2)
Make sure that the hydraulic systems are depressurized and put them in the maintenance configuration. (Ref. TASK 29-00-00-864-001).
(3)
Make sure that the reservoirs of the Green, Blue and Yellow hydraulic systems are depressurized (Ref. TASK 29-14-00-614-001).
(4)
Make sure that the warning notices are in position to tell persons not to pressurize the Green, Blue and Yellow hydraulic systems:
-in the cockpit on the hydraulic section 40VU of the overhead panel,
- on the ground service panel of the Green, Blue and Yellow hydraulic systems.
(5) Make sure that the access panel 195BB is open.
Subtask 29-14-42-865-051
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged
-------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------49VU HYD/HYD PWR/B WARN/& CTL 2702GJ C12 121VU APU/APU/CTL 2KD L42 121VU APU/ECB/SPLY 1KD L41 121VU HYDRAULIC/HYD POWER/Y 3803GX N30 121VU HYDRAULIC/G HYD/PUMP ENG1/CTL 1701GK R35 121VU HYDRAULIC/G HYD/PUMP ENG1/MONG 1702GK R34 123VU B HYD/ELEC PUMP 2701GJ AB09 123VU Y HYD/ELEC/PUMP 3802GX AB06
R 123VU Y HYD/ELEC/ELEC PUMP/NORM 3801GX AB03 4. Procedure
_________ (Ref. Fig. 401/TASK 29-14-42-991-001) Subtask 29-14-42-420-050
A. Installation of the Water Separator
(1)
Clean the component interface and/or the adjacent area.
(2)
Do an inspection of the component interface and/or the adjacent area.
(3)
Apply HYDRAULIC FLUIDS (Material No. 02-003) to the packings (5) and
(6) and put them in position on the water separator (3).
(4)
Engage the water separator (3) in the reservoir pressurization unit (2).
(5)
Install the bolts (4). Subtask 29-14-42-790-050
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM HYDRAULIC POWER 液压5(45)