R **ON A/C 106-149, 301-399, 401-499,
6. Test
____
A. Smoke Warning Test On ground, SMOKE WARN TESTS can be selected on the SDCU menu of the MCDU. If submenu SMK DET LAVATORY TEST is selected, a submenu with all lavatory smoke detectors installed is displayed. A test for each lavatory smoke detector can be selected by the line key. During the test the active CIDS channel sends a test request to the relative lavatory smoke detector via the DEU B and the CAN bus. If the smoke detector is operative it transmits a test-alarm information to the DEU B. The DEU B transmits the information to the CIDS-SDF via the CIDS internal bus. The CIDS starts the cabin indications (chime, FAP, AIP, ACP) and the CIDS-SDF sets the ARINC 429 outputs to the FWC. The lavatory smoke warning is displayed on ECAM together with a repetitive chime and master warning. The test finishes when all indications are confirmed or when the MCDU line key RETURN is selected.
R 1EFF : ALL 1 26-17-00Page 19 1 1 Aug 01/05 1 1 1CES 1
LAVATORY SMOKE DETECTION - ADJUSTMENT/TEST
__________________________________________
R TASK 26-17-00-710-001 R Operational Test of the Lavatory Smoke-Detection System R 1. Reason for the Job
__________________ R Refer to the MPD TASK: 261700-03 R 2. Job Set-up Information
______________________
R A. Referenced Information
R -------------------------------------------------------------------------------R REFERENCE DESIGNATION R -------------------------------------------------------------------------------
R 24-41-00-861-002 R R 24-41-00-862-002 R R 31-32-00-860-005 R R 31-60-00-860-001 R 31-60-00-860-002
R 3. Job Set-up
__________
R Subtask 26-17-00-860-050 Energize the Aircraft Electrical Circuits from the External Power De-energize the Aircraft Electrical Circuits Supplied from the External Power Procedure to Get Access to the SYSTEM REPORT/TEST FIRE PROT Page EIS Start Procedure EIS Stop Procedure
R A. Aircraft Maintenance Configuration
R (1) Energize the aircraft electrical circuits R (Ref. TASK 24-41-00-861-002).
R (2) Do the EIS start procedure (Upper ECAM DU and lower ECAM DU only) R (Ref. TASK 31-60-00-860-001).
R (3) On one MCDU get the SYSTEM REPORT/TEST FIRE PROT menu (Ref. TASK 31-R 32-00-860-005).
R 1EFF : ALL 1 26-17-00Page 501 1 1 Aug 01/05 1 1 1CES 1
R Subtask 26-17-00-865-054
R B. Make sure that this(these) circuit breaker(s) is(are) closed:
R -------------------------------------------------------------------------------
R PANEL DESIGNATION IDENT. LOCATION
R -------------------------------------------------------------------------------
R **ON A/C 001-049, 051-099, 101-105, 151-199, 201-299,
R 49VU AIR COND/SDCU/CHAN1 11WQ C06
R **ON A/C 001-049, 051-099, 101-105, 201-299,
R 49VU COM/CIDS/DIR 1 AND 2/ESS 150RH G02
R **ON A/C 106-149, 301-399, 401-499,
R 49VU AIR COND/CIDS/SDF/DIR2 ESS 18WH C06
R 49VU AIR COND/CIDS/SDF/DIR1 ESS 15WH C05
R **ON A/C 106-149, 401-499,
R 49VU COM/CIDS/DIR ESS/2 157RH G02
R **ON A/C 106-149, 151-199, 301-399, 401-499,
R 49VU COM DIR ESS/1 150RH G01
R **ON A/C 151-199, 301-399,
R 49VU COM DIR ESS/2 157RH G02
R **ON A/C 001-049, 051-099, 101-105, 151-199, 201-299,
R 121VU COM NAV/CIDS/DIR 1 AND 2/NORM 151RH M05
R 1EFF : ALL 1 26-17-00Page 502 1 1 Aug 01/05 1 1 1CES 1
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
R **ON A/C 106-149, 151-199, 401-499,
R 121VU COM NAV/CIDS/DIR NORM/2 156RH M06
R **ON A/C 301-399,
R 121VU COM NAV/CIDS/DIR NORM/2 156RH M07
R 121VU COM NAV/CIDS/DIR NORM/1 151RH M06
R **ON A/C 001-049, 051-099, 101-105, 151-199, 201-299,
R 122VU AIR COND/SDCU/CHAN2 12WQ T18
R **ON A/C 106-149, 301-399, 401-499,
R 122VU AIR COND/CIDS/SDF/DIR NORM/2 14WH T18
R 122VU AIR COND/CIDS/SDF/DIR NORM/1 17WH T17
R 1EFF : ALL 1 26-17-00Page 503 1 1 Aug 01/05 1 1 1CES 1
R **ON A/C ALL
R 4. Procedure_________
R **ON A/C 001-049, 051-061, 101-105,