• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-03-21 08:41来源:未知 作者:admin
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

 Subtask 26-17-34-010-050
 D. Get Access
 (1)
 Put the access platform in position.

 (2)
 Open the access door 811.


 4. Procedure
_________ (Ref. Fig. 401/TASK 26-17-34-991-001) Subtask 26-17-34-020-050
 A. Remove the Smoke Detection Control Unit (SDCU)
 (1)
 Loosen the knurled nut (4), and disengage it from the control unit (1).

 (2)
 Remove the control unit (1) from the support (2).

 (3)
 Put blanking caps on the electrical connector on the control unit (1) and on the receptacle on the rack (2).


R 1EFF : 001-049, 051-099, 101-105, 151-199, 1 26-17-34Page 402 1201-299, 1May 01/05 1 1 1CES 1


 Smoke-Detection Control Unit
 Figure 401/TASK 26-17-34-991-001

R 1EFF : 001-049, 051-099, 101-105, 151-199, 1 26-17-34Page 403 1201-299, 1May 01/05 1 1 1CES 1 TASK 26-17-34-400-001


 Installation of the Smoke-Detection Control Unit (SDCU) (10WQ)
 1.
 Reason for the Job

__________________
 Self Explanatory


 2.
 Job Set-up Information


______________________
 A. Fixtures, Tools, Test and Support Equipment
 -------------------------------------------------------------------------------
REFERENCE  QTY DESIGNATION
 -------------------------------------------------------------------------------
No specific  access platform 1 m (3 ft. 3 in.)
 B. Referenced Information
 -------------------------------------------------------------------------------
REFERENCE  DESIGNATION
 -------------------------------------------------------------------------------
24-42-00-861-001 Energize the Ground Service Network from the External Power 24-42-00-862-001 De-energize the Ground Service Network Supplied from
 the External Power
R 26-16-00-710-001 Operational Check of Cargo-Compartment
R  Smoke-Detection by PTT
 26-17-00-710-001  Operational Test of the Lavatory Smoke-Detection System 26-17-34-991-001 Fig. 401
 3. Job Set-up
__________
 Subtask 26-17-34-860-051

 A. Aircraft Maintenance Configuration
 (1) Make sure that the ground service network is energized (Ref. TASK 24-42-00-861-001).
R 1EFF : 001-049, 051-099, 101-105, 151-199, 1 26-17-34Page 404 1201-299, 1May 01/05 1 1 1CES 1 Subtask 26-17-34-865-051


 B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged
 -------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------49VU AIR COND/SDCU/CHAN1 11WQ C06 122VU AIR COND/SDCU/CHAN2 12WQ T18
 Subtask 26-17-34-860-050
 C. Make sure that the access platform in position. Subtask 26-17-34-010-051
 D. Make sure that the access door 811 is open.
 4. Procedure
_________ (Ref. Fig. 401/TASK 26-17-34-991-001) Subtask 26-17-34-420-050
 A. Install the Smoke Detection Control Unit (SDCU)
 (1)
 Remove the blanking caps from the electrical connector on the control unit (1) and from the receptacle on the rack (2).

 (2)
 Put the control unit (1) on the rack (2).

 (3)
 Push the control unit (1) to engage the connector (3).


 (4) Attach the control unit (1) to its rack (2) with the knurled nut (4). Subtask 26-17-34-865-052
 B. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s): 11WQ, 12WQ
R 1EFF : 001-049, 051-099, 101-105, 151-199, 1 26-17-34Page 405 1201-299, 1May 01/05 1 1 1CES 1 **ON A/C 001-003,


 Subtask 26-17-34-710-050
 C. Do an operational test of the control unit. (Ref. TASK 26-17-00-710-001) R **ON A/C 004-049, 051-099, 101-105, 151-199, 201-299,
 Subtask 26-17-34-710-050-A
 C. Do an operational test of the control unit (Ref. TASK 26-17-00-710-001) (Ref. TASK 26-16-00-710-001).

R **ON A/C 001-049, 051-099, 101-105, 151-199, 201-299,
 5. Close-up
________
 Subtask 26-17-34-862-050

 A. Put the aircraft back to its initial configuration.
 (1) De-energize the ground service network (Ref. TASK 24-42-00-862-001). Subtask 26-17-34-410-050
 B. Close Access
 (1)
 Make sure that the work area is clean and clear of tool(s) and other items.

 (2)
 Close the access door 811

 (3)
 Remove the access platform.


R 1EFF : 001-049, 051-099, 101-105, 151-199, 1 26-17-34Page 406 1201-299, 1May 01/05 1 1 1CES 1 EXTINGUISHING - DESCRIPTION AND OPERATION
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM FIRE PROTECTION 防火1(106)