• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-03-21 08:41来源:未知 作者:admin
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

 (Ref. Fig. 401C/TASK 26-16-15-991-001-B)
 **ON A/C 301-302,

 (Ref. Fig. 401D/TASK 26-16-15-991-001-C)
 **ON A/C 303-399,

 (Ref. Fig. 401E/TASK 26-16-15-991-001-E) R **ON A/C 401-499,
R (Ref. Fig. 401F/TASK 26-16-15-991-001-F) **ON A/C 001-049, 051-061, 101-105, 201-203,
 Subtask 26-16-15-020-050
 A. Removal of the Smoke Detector
 WARNING : DO NOT TRY TO OPEN OR REPAIR THE SMOKE DETECTORS.

_______ THE DETECTOR CONTAINS RADIOACTIVE AMERICIUM 241 OF APPROXIMATELY 0.4 MICROCURIES. ONLY WORKSHOPS AUTHORIZED BY THE MANUFACTURER CAN DO WORK ON THE SMOKE DETECTORS.
 NOTE : The removal procedure is the same for all smoke detectors.
____
 (1)
 Remove the ceiling smoke channels for access to the grid (2).

 (2)
 Release the quick release fasteners (1).

 (3)
 Remove the grid (2).

 (4)
 Disconnect the electrical connector (3) from the smoke detector (6).


R 1EFF : 001-049, 051-061, 101-149, 151-199, 1 26-16-15Page 406 1201-203, 229-299, 301-399, 401-499, 1Aug 01/05 1 1 1CES 1


 Smoke Detectors Figure 401B/TASK 26-16-15-991-001-D
R 1EFF : 106-149, 229-299, 1 26-16-15Page 407 1 1 Aug 01/05 1 1 1CES 1


 Smoke Detectors
 Figure 401C/TASK 26-16-15-991-001-B 
R 1EFF :  151-199,  1  26-16-15 Page 408 
1  1  Aug 01/05
 1  1
 1CES  1

 

 Smoke Detectors
 Figure 401D/TASK 26-16-15-991-001-C 
R 1EFF :  301-302,  1  26-16-15 Page 409 
1  1  Aug 01/05
 1  1
 1CES  1

 

R  Smoke Detectors 
R  Figure 401E/TASK 26-16-15-991-001-E 
R 1EFF :  303-399,  1  26-16-15 Page 410 
1  1  Feb 01/05
 1  1
 1CES  1

 

R  Smoke Detectors 
R  Figure 401F/TASK 26-16-15-991-001-F 
R 1EFF :  401-499,  1  26-16-15 Page 411 
1  1  Aug 01/05
 1  1
 1CES  1

 

 (5)
 Put blanking caps on the disconnected electrical connectors.

 (6)
 Remove the screws (4) and the washers (5).


 (7) Remove the smoke detector (6). R **ON A/C 062-099, 106-149, 151-199, 204-299, 301-399, 401-499,
 Subtask 26-16-15-020-050-A
 A. Removal of the Smoke Detector NOTE : The removal procedure is the same for all smoke detectors.
____
 (1)
 Remove the ceiling smoke channels for access to the grid (2).

 (2)
 Release the quick release fasteners (1).

 (3)
 Remove the grid (2).

 (4)
 Disconnect the electrical connector (3) from the smoke detector (6).

 (5)
 Put blanking caps on the disconnected electrical connectors.

 (6)
 Remove the screws (4) and the washers (5).

 (7)
 Remove the smoke detector (6).

 


 **ON A/C ALL
 TASK 26-16-15-400-001 Installation of the Cargo Smoke Detectors
 1.
 Reason for the Job

__________________
 Self Explanatory


 2.
 Job Set-up Information


______________________
 A. Referenced Information
 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
24-41-00-861-002 Energize the Aircraft Electrical Circuits from the External Power 26-16-00-710-001 Operational Check of Cargo-Compartment Smoke-Detection by PTT
 **ON A/C 001-003,
 26-16-15-991-001 Fig. 401 **ON A/C 004-049, 051-099, 101-105, 201-228,
 26-16-15-991-001-A Fig. 401A **ON A/C 106-149, 229-299,
 26-16-15-991-001-D Fig. 401B **ON A/C 151-199,
 26-16-15-991-001-B Fig. 401C
 1EFF : ALL 1 26-16-15Page 413 1 1 Aug 01/05R 1 1 1CES 1


 -------------------------------------------------------------------------------
REFERENCE DESIGNATION -------------------------------------------------------------------------------
**ON A/C 301-302,
 26-16-15-991-001-C Fig. 401D
 **ON A/C 303-399,

 26-16-15-991-001-E Fig. 401E R **ON A/C 401-499,

R  26-16-15-991-001-F Fig. 401F **ON A/C ALL
 3. Job Set-up
__________
 Subtask 26-16-15-861-052

 A. Make sure the aircraft electrical circuits are energized (Ref. TASK 24-41-00-861-002).
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM FIRE PROTECTION 防火1(86)