Subtask 27-94-34-010-050 R B. Get Access
(1)
Put the access platform in position.
(2)
Open the access door:
FOR 1CE1, 1CE2
824
FOR 1CE3
811
(3)
Put the access platform in position at the access door 822.
(4)
Open the access door 822.
(5)
On the battery power center 105VU:
-loosen the two screws and remove the protective cover
Subtask 27-94-34-865-050
R C. Open, safety and tag this(these) circuit breaker(s):
-------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------FOR 1CE1
49VU FLIGHT CONTROLS/SEC1/NORM/SPLY 21CE1 B08 105VU FLT CTL/SEC1/STBY SPLY 22CE B01 FOR 1CE2 121VU FLIGHT CONTROLS/SEC2/SPLY 21CE2 Q18 FOR 1CE3 121VU FLIGHT CONTROLS/SEC3/SPLY 21CE3 Q19
4. Procedure
_________
(Ref. Fig. 401/TASK 27-94-34-991-001)
Subtask 27-94-34-020-050
A. Removal of the SEC
(1)
Loosen the knurled nuts (4).
(2)
Lower the nuts (4).
(3)
Pull the SEC (1) on its rack (3) to disconnect the electrical connectors (2).
(4)
Remove the SEC (1).
(5)
Put blanking caps on the disconnected electrical connectors (2).
Spoiler Elevator Computer (SEC)
Figure 401/TASK 27-94-34-991-001
1EFF : ALL 1 27-94-34 Page 403
1 1 Feb 01/98
1 1
1CES 1
TASK 27-94-34-400-001
Installation of the SEC (1CE1,1CE2,1CE3)
1. Reason for the Job
__________________
Self Explanatory
2. Job Set-up Information
______________________
A. Fixtures, Tools, Test and Support Equipment
-------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific access platform 1.6 m (5 ft. 3 in.)
B. Referenced Information
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
27-94-34-991-001 Fig. 401
FOR FIN 1CE1, 1CE2 R 52-41-00-410-002 Close the Avionics Compartment Doors after Access R
FOR FIN 1CE3 27-94-00-710-001 Operational Test of the Spoiler Elevator Computer 3
(SEC 3) FOR FIN 1CE1 27-94-00-710-002 Operational Test of the Spoiler Elevator Computer 1
(SEC 1) FOR FIN 1CE2 27-94-00-710-003 Operational Test of the Spoiler Elevator Computer 2
(SEC 2) 3. Job Set-up
__________
Subtask 27-94-34-010-052
A. Get Access
(1)
Make sure that the access platform is in position at the access doors 822, 824 and 811.
(2)
Make sure that the access doors 822 are open:
FOR 1CE1, 1CE2
824
FOR 1CE3
811
(3)
On the battery power center 105VU:
-Make sure that the protective cover is open.
Subtask 27-94-34-865-051
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged
-------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------FOR 1CE1