• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-03-22 06:40来源:蓝天飞行翻译 作者:admin
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者


 5. Close-up
________ Subtask 27-92-41-080-053
 A. Removal of the Tools
 (1)
 Remove the RIGGING PIN (98DNSA20206080) from the roll transducer unit.

 (2)
 Disconnect the 28 VDC POWER SUPPLY TOOL (355M03200001) from the electrical connector (15). FOR 12CA1 Disconnect the 2197VC FOR 12CA2 disconnect the 2188VC (Ref. Fig. 402/TASK 27-92-41-991-002-A)

 (3)
 Remove the blanking caps from the electrical connectors.

 (4)
 Make sure that the electrical connectors are clean and in the correct condition.


 (5) Connect the electrical connector (15). Subtask 27-92-41-410-053
 B. Installation of the Components
 (1)
 Install the bellows (Ref. TASK 27-92-41-400-009).

 (2)
 Install the side stick assembly (Ref. TASK 27-92-41-400-001).


 1EFF : ALL 1 27-92-41Page 436 1 1 May 01/03R 1 1 1CES 1


 Subtask 27-92-41-080-054
 C. Remove the HOLDER - SIDE STICK (98D27303001001).
 1EFF : ALL 1 27-92-41Page 437 1 1 May 01/03R 1 1 1CES 1


 TASK 27-92-41-000-006 Removal of the Control Handle
 1.
 Reason for the Job

__________________
 Self Explanatory


 2.
 Job Set-up Information


______________________
 A. Fixtures, Tools, Test and Support Equipment
 -------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific blanking caps
 No specific circuit breaker(s) safety clip(s)
 No specific access platform 1.6 m (5 ft. 3 in.)

 B. Referenced Information
 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
24-42-00-861-001 Energize the Ground Service Network from the External
 Power 27-92-41-000-009 Removal of the Side Stick Bellows 27-92-41-991-007 Fig. 407
 3. Job Set-up
__________ Subtask 27-92-41-861-054
 A. Energize the ground service network
 (Ref. TASK 24-42-00-861-001).

 Subtask 27-92-41-010-067
 B. Get Access
 (1)
 Put the access platform in position at the access door 822.

 (2)
 Open the access door 822.


 1EFF : ALL 1 27-92-41Page 438 1 1 May 01/03R 1 1 1CES 1


 (3) On the battery power center 105VU:
 -loosen the two screws and remove the protective cover.
 Subtask 27-92-41-865-051
 C. Open, safety and tag this(these) circuit breaker(s):
 -------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------49VU FLIGHT CONTROLS/ELAC1/NORM/SPLY 15CE1 B11 49VU FLIGHT CONTROLS/SEC1/NORM/SPLY 21CE1 B08 49VU COM/AUDIO/ACP/F/O 5RN G07 49VU COM/AUDIO/ACP/CAPT 4RN G06 105VU FLIGHT CONTROLS/ELAC2/STBY SPLY 16CE2 A02 105VU FLT CTL/ELAC1/STBY SPLY 16CE1 A01 105VU FLT CTL/SEC1/STBY SPLY 22CE B01 121VU AUTO FLT/STICK/LOCK 13CA N16 121VU FLIGHT CONTROLS/SEC3/SPLY 21CE3 Q19 121VU FLIGHT CONTROLS/SEC2/SPLY 21CE2 Q18 121VU FLIGHT CONTROLS/ELAC2/NORM/SPLY 15CE2 R20
 Subtask 27-92-41-010-055
 D. Remove the bellows (Ref. TASK 27-92-41-000-009).
 4. Procedure_________
 (Ref. Fig. 407/TASK 27-92-41-991-007)
 Subtask 27-92-41-020-055
 A. Removal of the Control Handle
 (1)
 Cut and discard the lockwires. Remove the screws (76) and (78) and the washers (77) and (79). Disconnect the handle (75) and remove it.

 (2)
 Put blanking caps on the disconnected electrical connectors.


 (80) and (81).
 1EFF : ALL 1 27-92-41Page 439 1 1 May 01/03R 1 1 1CES 1


 Control Handle Figure 407/TASK 27-92-41-991-007
 1EFF : 1 1R 1CES  ALL  1 11 1 27-92-41 Page 440 May 01/03

 

 TASK 27-92-41-400-006
 Installation of the Control Handle
 1. Reason for the Job
__________________
 Self Explanatory
 2. Job Set-up Information
______________________
 A. Fixtures, Tools, Test and Support Equipment
 -------------------------------------------------------------------------------
REFERENCE  QTY DESIGNATION
 -------------------------------------------------------------------------------
No specific  access platform 1.6 m (5 ft. 3 in.)
 B. Consumable Materials
 -------------------------------------------------------------------------------
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM FLIGHT CONTROLS 飞行操纵9(49)