ACTION RESULT
-------------------------------------------------------------------------------On the upper ECAM display unit, make sure that:
-no F/CTL FCDC1 FAULT message is shown.
3. On the circuit breaker panel On the upper ECAM display unit: 121VU: - the F/CTL FCDC2 FAULT message goes
-close the C/B 20CE2. out of view.
4. On the circuit breaker panel On the upper ECAM display unit: 49VU: - the F/CTL FCDC1 FAULT message is - open the C/B 20CE1. shown.
-
make sure that no F/CTL FCDC2 FAULT
message is shown.
On the lower ECAM display unit, on the
F/CTL page:
-
make sure that there are no crosses
on the EFCS servocontrols.
5. On the circuit breaker panel On the upper ECAM display unit: 49VU: - the F/CTL FCDC1 FAULT message goes
-close the C/B 20CE1. out of view.
5. Close-up________
Subtask 27-96-00-860-059
A. Put the aircraft back to its initial configuration.
(1)
Do the EIS stop procedure (Ref. TASK 31-60-00-860-002).
(2)
De-energize the aircraft electrical circuits (Ref. TASK 24-41-00-862-002).
1EFF : ALL 1 27-96-00Page 503 1 1 Feb 01/05R 1 1 1CES 1
TASK 27-96-00-710-002
Operational Test of the Computers Engagement/Disengagement
1. Reason for the Job
__________________
Refer to the MPD TASK: 279000-01 Do the check of the pushbutton switches related to the ELACs and SECs for their correct operation.
2. Job Set-up Information
______________________
A. Referenced Information
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
24-41-00-861-002 Energize the Aircraft Electrical Circuits from the External Power 24-41-00-862-002 De-energize the Aircraft Electrical Circuits Supplied
from the External Power 31-60-00-860-001 EIS Start Procedure 31-60-00-860-002 EIS Stop Procedure
3. Job Set-up
__________
Subtask 27-96-00-860-060
A. Aircraft Maintenance Configuration
(1)
Energize the aircraft electrical circuits (Ref. TASK 24-41-00-861-002).
(2)
On the overhead panel 23VU, make sure that:
-the FLT CTL/ELAC 1 and FLT CTL/SEC 1 pushbutton switches are pushed (on these pushbutton switches, the FAULT and OFF legends are off).
(3)
On the overhead panel 24VU, make sure that:
-the FLT CTL/ELAC 2, FLT CTL/SEC 2 and FLT CTL/SEC 3 pushbutton switches are pushed (on these pushbutton switches, the FAULT and OFF legends are off).
(4)
On the center pedestal, on the panel 8VU, make sure that:
-the SWITCHING/ATT HDG, SWITCHING/AIR DATA, SWITCHING/EIS DMC and SWITCHING/ECAM/ND XFR selector switches are in the NORM position.
(5)
Do the EIS start procedure (Ref. TASK 31-60-00-860-001).
(6)
On the center pedestal, on the ECAM control panel:
-push the F/CTL key (on the lower ECAM display unit, the F/CTL page comes into view).
Subtask 27-96-00-865-054
B. Make sure that this(these) circuit breaker(s) is(are) closed:
-------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------49VU FLIGHT CONTROLS/ELAC1/NORM/SPLY 15CE1 B11 49VU FLIGHT CONTROLS/SEC1/NORM/SPLY 21CE1 B08 121VU FLIGHT CONTROLS/SEC3/SPLY 21CE3 Q19 121VU FLIGHT CONTROLS/SEC2/SPLY 21CE2 Q18 121VU FLIGHT CONTROLS/ELAC2/NORM/SPLY 15CE2 R20
4. Procedure
_________
Subtask 27-96-00-710-054
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM FLIGHT CONTROLS 飞行操纵9(115)