C. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
23-12-00-710-001 Operational Test of the VHF System 24-42-00-861-001 Energize the Ground Service Network from the External Power 24-42-00-862-001 De-energize the Ground Service Network Supplied from the External Power 27-92-41-400-009 Installation of the Side Stick Bellows
R 27-92-41-710-001 Operational Test of the Side Stick Assembly 27-96-00-710-003 Operational Test of the Side Stick Priority 27-92-41-991-007 Fig. 407
3. Job Set-up__________
Subtask 27-92-41-861-055
A. Make sure that the ground service network is energized (Ref. TASK 24-42-00-861-001).
Subtask 27-92-41-010-068
B. Get Access
(1)
Make sure that the access platform is in position at the access door
822.
(2)
Make sure that the access door 822 is open.
(3)
On the battery power center 105VU:
-make sure that the protective cover is removed.
Subtask 27-92-41-865-056
C. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged
-------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------49VU FLIGHT CONTROLS/ELAC1/NORM/SPLY 15CE1 B11 49VU FLIGHT CONTROLS/SEC1/NORM/SPLY 21CE1 B08 49VU COM/AUDIO/ACP/F/O 5RN G07 49VU COM/AUDIO/ACP/CAPT 4RN G06 105VU FLIGHT CONTROLS/ELAC2/STBY SPLY 16CE2 A02 105VU FLT CTL/ELAC1/STBY SPLY 16CE1 A01 105VU FLT CTL/SEC1/STBY SPLY 22CE B01 121VU AUTO FLT/STICK/LOCK 13CA N16 121VU FLIGHT CONTROLS/SEC3/SPLY 21CE3 Q19 121VU FLIGHT CONTROLS/SEC2/SPLY 21CE2 Q18 121VU FLIGHT CONTROLS/ELAC2/NORM/SPLY 15CE2 R20
Subtask 27-92-41-869-063
D. Make sure that the bellows are removed.
1EFF : ALL 1 27-92-41Page 442 1 1 May 01/03R 1 1 1CES 1
4. Procedure
_________
(Ref. Fig. 407/TASK 27-92-41-991-007)
Subtask 27-92-41-420-055
A. Installation of the Control Handle
(1) Remove the blanking caps from the electrical connectors. R (80) and (81).
(2)
Make sure that the electrical connectors are clean and in the correct condition.
(3)
Connect the handle (75) to the electrical connectors (80). Install the washers (77) and (79), the screws (76) and (78).
(4)
Tighten the screws (76) and (78) and safety them with MISCELLANEOUS (Material No. 19-009).
Subtask 27-92-41-410-055
B. Installation of the Bellows. (Ref. TASK 27-92-41-400-009)
Subtask 27-92-41-210-051
C. Check of the Side Stick Movement
(1) Make sure that the side stick :
(a)
Is free to move.
(b)
Has no friction point along its full range of operation.
(c)
Comes correctly to its stops in all the directions.
(d) Goes back to the neutral position when you release it.
Subtask 27-92-41-865-064
D. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s): 15CE1, 15CE2, 16CE1, 16CE2, 21CE1, 21CE2, 21CE3, 22CE, 13CA, 4RN, 5RN
Subtask 27-92-41-710-051
E. Operational Test
R R (1) Do the operational test of the Side Stick Assembly (Ref. TASK 27-92-41-710-001).
R (2) Do the operational test of the AP disconnect/priority pushbutton switch (Ref. TASK 27-96-00-710-003).
R (3) Do the operational test of the radio PTT switch (Ref. TASK 23-12-00-710-001).
5. Close-up________
Subtask 27-92-41-942-051
A. Make sure that the work area is clean and clear of tool(s) and other items.
Subtask 27-92-41-862-053
B. De-energize the ground service network (Ref. TASK 24-42-00-862-001).
Subtask 27-92-41-410-066
C. Close Access
(1) Install the protective cover on the battery power center 105VU.
(2) Tighten the two screws.
(3) Close the access door 822.
(4) Remove the access platform(s).
TASK 27-92-41-000-010
Removal of the Radio PTT Switch (11RN,12RN)
1.
Reason for the Job
__________________
Self Explanatory
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM FLIGHT CONTROLS 飞行操纵9(50)