7. Test
____
A. Power-up Tests Initialization and Cockpit Repercutions
(1)
Conditions of power-up tests initialization
-How long must the computer be de-energized: 5 s
-A/C configuration: hydraulic system depressurized
(2)
Progress of power-up tests
(a)
Duration: 18 s
(b)
Cockpit repercussions directly linked to power-up test accomplishment (some other repercussions may occur depending on the A/C configuration, but these can be disregarded):
-
ECAM F/CTL page
*
SEC in amber
*
associated elevators amber crossed
*
associated spoilers amber crossed then flash at the end of the test
-
ECAM warning
* F/CTL SEC 1(2)(3) FAULT during 23 s approx
-F/CTL panel
* FAULT legend of ELAC P/BSW on during 8 s
(3)
Results of power-up tests (cockpit repercussions, if any, in case of tests passed/tests failed)
(a) Tests passed
-
ECAM F/CTL page
* SEC in green
-
ECAM warning
* F/CTL SEC 1(2)(3) FAULT disappears
-F/CTL panel
* FAULT legend of SEC P/BSW off
(b) Tests failed
-
ECAM F/CTL page
* SEC and associated elevators and spoilers in amber
-
ECAM warning
* F/CTL SEC 1(2)(3) FAULT
-F/CTL panel
* FAULT legend of SEC P/BSW on
SEC SYSTEM (SPOILER AND ELEVATOR COMPUTER) - DEACTIVATION/REACTIVATION
______________________________________________________________________ TASK 27-94-00-040-002 Deactivation of the Spoiler Elevator Computer (SEC)
1. Reason for the Job
__________________
Refer to the MMEL TASK: 27-94-01
Spoiler Elevator Computer (SEC) - SEC
2. Job Set-up Information
______________________
A. Fixtures, Tools, Test and Support Equipment
-------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific warning notice
No specific access platform 1.6 m (5 ft. 3 in.)
B. Referenced Information
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
24-41-00-861-002 Energize the Aircraft Electrical Circuits from the External Power 24-41-00-862-002 De-energize the Aircraft Electrical Circuits Supplied from the External Power
3. Job Set-up
__________ Subtask 27-94-00-860-054
A. Aircraft Maintenance Configuration
(1)
Energize the aircraft electrical circuits
(Ref. TASK 24-41-00-861-002).
(2)
On the overhead panel, on the FLT CTL panel 23VU:
-make sure that the FLT CTL/ELAC1 pushbutton switch is pushed . (On this pushbutton switch the OFF legend is off).
1EFF : ALL 1 27-94-00Page 401 1 1 Feb 01/02R 1 1 1CES 1
(3) On the overhead panel, on the FLT CTL panel 24VU
-make sure that the FLT CTL/ELAC2 pushbutton switch is pushed . (On this pushbutton switch the OFF legend is off).
Subtask 27-94-00-010-053
B. Get Access
(1)
Put the access platform in position at the access door 822.
(2)
Open the access door 822.
(3)
At the battery power center 105VU:
-loosen the two screws and remove the protective cover.