(5)
Install the washers (52), the nuts (51) and tighten.
(6)
Install the new cotter pins (50) on the nuts (51).
5. Close-up
________ Subtask 27-92-41-080-052
A. Remove the HOLDER - SIDE STICK (98D27303001000) from the side stick
assembly.
1EFF : ALL 1 27-92-41Page 427 1 1 May 01/03R 1 1 1CES 1
Subtask 27-92-41-410-052
B. Install the side stick assembly (Ref. TASK 27-92-41-400-001).
1EFF : ALL 1 27-92-41Page 428 1 1 May 01/03R 1 1 1CES 1
TASK 27-92-41-000-004 Removal of the Solenoid (12CA1,12CA2) WARNING : MAKE SURE THAT THE SIDE STICK ASSEMBLY STAYS IN THE VERTICAL POSITION
_______
DURING THE MAINTENANCE PROCEDURES.
IF NOT THERE IS A RISK OF SKYDROL LEAKAGE.
SKYDROL CAN CAUSE INJURY AND/OR DAMAGE.
1.
Reason for the Job
__________________
Self Explanatory
2.
Job Set-up Information
______________________
A. Fixtures, Tools, Test and Support Equipment
-------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific blanking caps
98D27303001001 1 HOLDER - SIDE STICK
B. Referenced Information
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
27-92-41-000-001 Removal of the Side Stick Assembly 19VU (18VU)
27-92-41-991-005-A Fig. 406
3. Job Set-up
__________ Subtask 27-92-41-010-053 R A. Remove the side stick assembly (Ref. TASK 27-92-41-000-001). Subtask 27-92-41-480-054
B. Install the side stick assembly on the HOLDER - SIDE STICK
(98D27303001001).
4. Procedure
_________
(Ref. Fig. 406/TASK 27-92-41-991-005-A) Subtask 27-92-41-020-053
A. Removal of the Side Stick Lock-Solenoid
(1)
Disconnect the electrical connector (63) from the solenoid (64).
(2)
Put blanking caps on the disconnected electrical connectors.
(3)
Cut and discard the lockwire from the screws (60).
(4)
Remove the screws (60), the washers (61) and the solenoid (64).
1EFF : ALL 1 27-92-41Page 430 1 1 May 01/03R 1 1 1CES 1
Solenoid Figure 406/TASK 27-92-41-991-005-A
1EFF : 1 1R 1CES ALL 1 11 1 27-92-41 Page 431 May 01/03
TASK 27-92-41-400-004
Installation of the Solenoid (12CA1,12CA2)
WARNING : MAKE SURE THAT THE SIDE STICK ASSEMBLY STAYS IN THE VERTICAL POSITION
_______ DURING THE MAINTENANCE PROCEDURES. IF NOT THERE IS A RISK OF SKYDROL LEAKAGE. SKYDROL CAN CAUSE INJURY AND/OR DAMAGE.
1. Reason for the Job
__________________
Self Explanatory
2. Job Set-up Information
______________________
A. Fixtures, Tools, Test and Support Equipment
-------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific blanking caps No specific dynamometer No specific gauge No specific warning notice No specific access platform 1.6 m (5 ft. 3 in.) 355M03200001 1 28 VDC POWER SUPPLY TOOL 98DNSA20206080 2 RIGGING PIN
B. Consumable Materials
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
No specific lockwire-corrosion resistant steel dia. 0.8 mm (0.03 in.). Material No. 08-007 USA MIL-R-46082 TYPE II SEALANT, HIGH TEMP. (Ref. 20-31-00)
1EFF : ALL 1 27-92-41Page 432 1 1 May 01/03R 1 1 1CES 1
C. Referenced Information
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
24-42-00-861-001 Energize the Ground Service Network from the External
Power 27-92-41-000-001 Removal of the Side Stick Assembly 19VU (18VU) 27-92-41-000-009 Removal of the Side Stick Bellows 27-92-41-400-001 Installation of the Side Stick Assembly 19VU (18VU) 27-92-41-400-009 Installation of the Side Stick Bellows 27-92-41-991-002-A Fig. 402 27-92-41-991-005-A Fig. 406
3. Job Set-up
__________
Subtask 27-92-41-860-053
A. Aircraft Maintenance Configuration
(1)
Make sure that the ground service network is energized (Ref. TASK 24-42-00-861-001).
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM FLIGHT CONTROLS 飞行操纵9(47)