• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-03-22 06:40来源:蓝天飞行翻译 作者:admin
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者


 Subtask 27-96-00-860-062
 C. Put the aircraft back to its initial configuration.
 (1)
 Depressurize the Green, Blue and Yellow hydraulic systems (Ref. TASK 29-23-00-864-001) (Ref. TASK 29-10-00-864-003) (Ref. TASK 29-24-00-864-001).

 (2)
 Do the EIS stop procedure (Ref. TASK 31-60-00-860-002).

 (3)
 De-energize the aircraft electrical circuits (Ref. TASK 24-41-00-862-002).


 1EFF : ALL 1 27-96-00Page 517 1 1 Aug 01/05R 1 1 1CES 1


 TASK 27-96-00-710-006
 Operational Test of the THS Actuator with Electrical Motor N.3
 WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______ START A TASK ON OR NEAR:
 -
THE FLIGHT CONTROLS

 -
THE FLIGHT CONTROL SURFACES

 -
THE LANDING GEAR AND THE RELATED DOORS


 -COMPONENTS THAT MOVE.
 WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROLS ARE CLEAR.
_______ MOVEMENT OF FLIGHT CONTROLS CAN CAUSE INJURY TO PERSONS AND/OR DAMAGE.
 1. Reason for the Job
__________________
 Refer to the MPD TASK: 274000-04
 2. Job Set-up Information
______________________
 A. Fixtures, Tools, Test and Support Equipment
 -------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific  access platform 1.6 m (5 ft. 3 in.)
 B. Referenced Information
 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
24-41-00-861-002 Energize the Aircraft Electrical Circuits from the External Power 24-41-00-862-002 De-energize the Aircraft Electrical Circuits Supplied from the External Power
 29-23-00-863-001  Pressurize the Green Hydraulic System from the Yellow Hydraulic System through the PTU with the Electric Pump
 29-23-00-864-001 Depressurize the Green and Yellow Hydraulic Systems after Operation of the PTU 29-24-00-863-001 Pressurize the Yellow Hydraulic System with the Electric Pump 29-24-00-864-001 Depressurize the Yellow Hydraulic System
 1EFF : ALL 1 27-96-00Page 518 1 1 Aug 01/05R 1 1 1CES 1


 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
31-60-00-860-001 EIS Start Procedure 31-60-00-860-002 EIS Stop Procedure 34-10-00-860-004 IR Alignment Procedure
 3. Job Set-up
__________ Subtask 27-96-00-860-065
 A. Aircraft Maintenance Configuration
 (1)
 Energize the aircraft electrical circuits (Ref. TASK 24-41-00-861-002).

 (2)
 Pressurize the Green and Yellow hydraulic systems of the aircraft (Ref. TASK 29-23-00-863-001) (Ref. TASK 29-24-00-863-001).

 (3)
 Make sure that the ADIRS are aligned (Ref. TASK 34-10-00-860-004).

 (4)
 On the overhead panel 23VU:

 -release the FLT CTL/ELAC 1 and FLT CTL/SEC 1 pushbutton switches (on these pushbutton switches, the OFF legends come on).

 (5)
 On the overhead panel 24VU:

 -release the FLT CTL/ELAC 2, FLT CTL/SEC 2 and FLT CTL/SEC 3 pushbutton switches (on these pushbutton switches, the OFF legends come on).

 (6)
 Do the EIS start procedure (Ref. TASK 31-60-00-860-001).

 (7)
 On the center pedestal, on the ECAM control panel, push the F/CTL pushbutton switch (on the lower ECAM display unit, the F/CTL page comes into view).


 Subtask 27-96-00-010-055
 B. Get Access
 (1)
 Put the access platform in position at the access door 822.

 (2)
 Open the access door 822.

 (3)
 On the battery power center 105VU:


 -loosen the two screws and remove the protective cover.
 1EFF : ALL 1 27-96-00Page 519 1 1 Aug 01/05R 1 1 1CES 1


 Subtask 27-96-00-865-053
 C. Make sure that this(these) circuit breaker(s) is(are) closed: -------------------------------------------------------------------------------
PANEL ------ DESIGNATION -------------------------------------------- IDENT. LOCATION-----------------------------
105VU FLT CTL/SEC1/STBY SPLY  22CE  B01
 121VU FLIGHT CONTROLS/SEC2/SPLY  21CE2  Q18
 121VU FLIGHT CONTROLS/THS ACTR/MOT3  19CE3  Q17
 4. Procedure_________
 Subtask 27-96-00-710-053
 A. Do this test:

 -------------------------------------------------------------------------------ACTION RESULT -------------------------------------------------------------------------------
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM FLIGHT CONTROLS 飞行操纵9(120)