 Self Explanatory
 2. Job Set-up Information
______________________
 A. Fixtures, Tools, Test and Support Equipment
 -------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific access platform 1.6 m (5 ft. 3 in.) DMC519 1 ELECTRICIAN SERVICE TOOL KIT
 B. Consumable Materials
 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
Material No. 08-013  USA MIL-R-46082 TYPE I MIL-S-22473 SEALANT, ANAEROBIC (Ref. 20-31-00)
 C. Expendable Parts
 -------------------------------------------------------------------------------FIG.ITEM |DESIGNATION |IPC-CSN -------------------------------------------------------------------------------
121 O-ring  27-92-41 02 -100
 1EFF : ALL 1 27-92-41Page 456 1 1 May 01/03R 1 1 1CES 1


 D. Referenced Information
 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
24-42-00-861-001 Energize the Ground Service Network from the External
 Power 27-92-41-400-006 Installation of the Control Handle 27-92-41-991-009 Fig. 409 27-92-41-991-010 Fig. 410 27-92-41-991-011 Fig. 411
 3. Job Set-up
__________ Subtask 27-92-41-860-059
 A. Aircraft Maintenance Configuration
 (1)
 Make sure that the ground service network is energized (Ref. TASK 24-42-00-861-001).

 (2)
 Make sure that the access platform is in position at the access door

 822.

 (3)
 Make sure that the access door 822 is open.

 (4)
 On the battery power center 105VU:


 -make sure that the protective cover is removed.
 4. Procedure
_________
 (Ref. Fig. 411/TASK 27-92-41-991-011) Subtask 27-92-41-420-060
 A. Installation of the Pushbutton Switch (8CE1,8CE2)
 (1)
 Install the new O-ring (121) (121) in its housing.

 (2)
 If you install a new pushbutton switch, you must install a pin contact at the end of each wire.

 (3)
 Install the pushbutton switch (120).


 1EFF : ALL 1 27-92-41Page 457 1 1 May 01/03R 1 1 1CES 1


 (4)
 Connect the cables of the pushbutton switch (120) to the electrical connectors (122) and (123) with the extraction/insertion tool P/N M81969/14.01 from the ELECTRICIAN SERVICE TOOL KIT (DMC519). (Ref. Fig. 409/TASK 27-92-41-991-009, 410/TASK 27-92-41-991-010)

 (5)
 Put the electrical connectors (122) and (123) in position.

 (6)
 Apply BONDING AND ADHESIVE COMPOUNDS (Material No. 08-013) on the threads of the screws (124).

 (7)
 Install the screws (124) and tighten them.


 5. Close-up
________ Subtask 27-92-41-410-062
 A. Install the control handle (Ref. TASK 27-92-41-400-006).
 1EFF : ALL 1 27-92-41Page 458 1 1 May 01/03R 1 1 1CES 1


 TASK 27-92-41-000-009
 Removal of the Side Stick Bellows
 1.
 Reason for the Job

__________________
 Self Explanatory


 2.
 Job Set-up Information


______________________
 A. Fixtures, Tools, Test and Support Equipment
 -------------------------------------------------------------------------------
REFERENCE  QTY DESIGNATION
 -------------------------------------------------------------------------------
No specific circuit breaker(s) safety clip(s)
 No specific warning notice
 No specific access platform 1.6 m (5 ft. 3 in.)
 98D27903500000 2 PIN-SIDE STICK LOCKING

 B. Referenced Information
 -------------------------------------------------------------------------------
REFERENCE  DESIGNATION
 -------------------------------------------------------------------------------
24-42-00-861-001  Energize the Ground Service Network from the External Power
 **ON A/C 001-049, 051-099, 101-105, 151-158, 201-210,
 27-92-41-991-001 Fig. 401 R **ON A/C 106-149, 159-199, 211-299, 301-399, 401-499,
 27-92-41-991-001-A Fig. 401A
 **ON A/C ALL

 27-92-41-991-012  Fig. 412


 3. Job Set-up__________
 Subtask 27-92-41-861-056
 A. Energize the ground service network
 (Ref. TASK 24-42-00-861-001).

 Subtask 27-92-41-010-069
 