2.
Job Set-up Information
______________________
A. Fixtures, Tools, Test and Support Equipment
-------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
DMC519 1 ELECTRICIAN SERVICE TOOL KIT
B. Referenced Information
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
27-92-41-000-006 Removal of the Control Handle 27-92-41-991-008 Fig. 408 27-92-41-991-009 Fig. 409 27-92-41-991-010 Fig. 410
3. Job Set-up
__________ Subtask 27-92-41-010-061
A. Remove the control handle (Ref. TASK 27-92-41-000-006)
4. Procedure
_________ Subtask 27-92-41-020-059
A. Removal of the Radio PTT Switch (11RN,12RN)
(Ref. Fig. 408/TASK 27-92-41-991-008)
(1) Remove the screws (108). Disengage the electrical connectors (106) and (107).
1EFF : ALL 1 27-92-41Page 445 1 1 May 01/03R 1 1 1CES 1
Radio PTT Switch Figure 408/TASK 27-92-41-991-008
1EFF : 1 1R 1CES ALL 1 11 1 27-92-41 Page 446 May 01/03
(2)
On the bottom electrical connector (107), disconnect the cables of the switch (105) with the extraction/insertion tool P/N M81969/14.01 ELECTRICIAN SERVICE TOOL KIT (DMC519).
(3)
Mark them. (Ref. Fig. 409/TASK 27-92-41-991-009, 410/TASK 27-92-41-991-010)
(4)
Remove the screws (100). Remove the cover plate (101).
(5)
Remove the blanking plug (113), the nut (112), the washer (111) and the trigger(110).
(6)
Remove the nut (109), the washer (103), the switch (105) with the washer (102).
1EFF : ALL 1 27-92-41Page 447 1 1 May 01/03R 1 1 1CES 1
Electrical Wiring of the Handle of the Captain Side Stick Figure 409/TASK 27-92-41-991-009
1EFF : ALL 1 27-92-41Page 448 1 1 May 01/03R 1 1 1CES 1
Electrical Wiring of the Handle of the First Officer Side Stick Figure 410/TASK 27-92-41-991-010
1EFF : ALL 1 27-92-41Page 449 1 1 May 01/03R 1 1 1CES 1
TASK 27-92-41-400-010
Installation of the Radio PTT Switch (11RN,12RN)
1. Reason for the Job
__________________
Self Explanatory
2. Job Set-up Information
______________________
A. Fixtures, Tools, Test and Support Equipment
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
No specific access platform 1.6 m (5 ft. 3 in.)
R No specific Torque Wrench : range 0.00 to 1.20 m.daN
R (0.00 to 9.00 lbf.ft) DMC519 1 ELECTRICIAN SERVICE TOOL KIT
B. Consumable Materials
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
Material No. 08-013 USA MIL-R-46082 TYPE I MIL-S-22473
SEALANT, ANAEROBIC (Ref. 20-31-00)
Material No. 09-023 USA MIL-S-38249 TYPE I
FIRE WALL SEALANT (Ref. 20-31-00)
C. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
24-42-00-861-001 Energize the Ground Service Network from the External
Power
27-92-41-400-006 Installation of the Control Handle
27-92-41-991-008 Fig. 408
27-92-41-991-009 Fig. 409
27-92-41-991-010 Fig. 410
3. Job Set-up
__________
Subtask 27-92-41-860-058
A. Aircraft Maintenance Configuration
(1)
Make sure that the ground service network is energized (Ref. TASK 24-42-00-861-001).
(2)
Make sure that the access platform is in position at the access door
822.
(3)
Make sure that the access door 822 is open.
(4)
On the battery power center 105VU:
-make sure that the protective cover is removed.
4. Procedure
_________
(Ref. Fig. 408/TASK 27-92-41-991-008)
Subtask 27-92-41-420-059
A. Installation of the Radio PTT Switch (11RN,12RN)
(1)
Install the nut (104), and the lock plate (102) on the switch (105).
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM FLIGHT CONTROLS 飞行操纵9(51)