A. Close Access
R (1) Close the rear avionic compartment door 824 (Ref. TASK 52-41-00-410-002).
(2) Remove the access platform(s).
TASK 05-28-20-200-008
R Zonal Inspection of Rear Avionic Compartment Door
1. Reason for the Job__________________
Refer to the MPD TASK: ZL-824-02
2. Job Set-up Information______________________
A. Fixtures, Tools, Test and Support Equipment
-------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific access platform 1.80 m (5 ft. 11 in.)
B. Referenced Information
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
52-41-00-010-002 52-41-00-410-002 05-28-20-991-002 Open the Avionics Compartment Doors for AccessClose the Avionics Compartment Doors after AccessFig. 602
3. Job Set-up__________
Subtask 05-28-20-010-057
A. Get Access
R (1) Put an access platform in position at zone 824.
R (2) Open the rear avionic compartment door 824 (Ref. TASK 52-41-00-010-002). (Ref. Fig. 602/TASK 05-28-20-991-002)
R (3) Remove the door panels and the insulation blankets.
4. Procedure
_________
Subtask 05-28-20-210-057
A. Inspection
R (1) Do a general visual inspection of the rear avionic compartment door.
(2) Make sure that there are no signs of corrosion, cracks or damage.
5. Close-up________
Subtask 05-28-20-410-057
A. Close Access
R (1) Install the insulation blankets and the door panels.
R (2) Close the rear avionic compartment door 824 (Ref. TASK 52-41-00-410-002).
(3) Remove the access platform(s).
ZONAL INSPECTION : PASSENGER/CREW DOORS AND EMERGENCY EXITS - INSPECTION/CHECK
______________________________________________________________________________
TASK 05-28-30-200-001
Zonal Inspection of FWD and AFT Passenger/Crew Doors including Door Stops on Fuselage Door Frames and Door Seals
1. Reason for the Job
__________________
Refer to the MPD TASK: ZL-831-01
2. Job Set-up Information
______________________
A. Fixtures, Tools, Test and Support Equipment
-------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific access platform 3.5 m (11 ft. 6 in.)
B. Referenced Information
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
52-10-00-010-001 Opening of the Passenger/Crew Door 52-10-00-410-001 Closing of the Passenger/Crew Door
3. Job Set-up
__________ Subtask 05-28-30-010-060
A. Get Access
(1)
Put an access platform in position at zone 831(841) or 832(842).
(2)
Open the passenger/crew doors 831(841) or 832(842) (Ref. TASK 52-10-00-010-001).
1EFF : ALL 1 05-28-30Page 601 1 1 Nov 01/04R 1 1 1CES 1
4. Procedure
_________
Subtask 05-28-30-210-050
A. Inspection
(1)
Do a general visual inspection of the FWD and AFT passenger/crew doors. This inspection includes the door stops on the fuselage door frames and the door seals.
(2)
Make sure that there are no signs of corrosion, cracks or damage.
(3)
Make sure that all the installations (wiring, piping) are attached
correctly. R
5. Close-up
________
Subtask 05-28-30-410-060
A. Close Access
(1)
Close the passenger/crew doors 831(841) or 832(842) (Ref. TASK 52-10-00-410-001).
(2)
Remove the access platform(s).
**ON A/C 001-049, 051-099, 101-149, 201-299,
TASK 05-28-30-200-003
Zonal Inspection of FWD and AFT Emergency Exits including Door Surround on Fuselage Door Frames and Door Seals
1.
Reason for the Job
__________________
Refer to the MPD TASK: ZL-833-01
2.
Job Set-up Information
______________________
A. Fixtures, Tools, Test and Support Equipment
-------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM 时间限制/维护检查 3(94)