__________________
Refer to the MPD TASK: ZL-200-03
2.
Job Set-up Information
______________________
A. Fixtures, Tools, Test and Support Equipment
-------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific access platform 2 m (6 ft. 7 in.)
3. Job Set-up
__________ Subtask 05-22-00-010-054
A. Get Access
(1) Put an access platform in position at the zone 200.
4. Procedure
_________ Subtask 05-22-00-210-052
A. Inspection
(1)
Do a general visual inspection of the upper half of the fuselage from the stringer 8 LH to the stringer 8 RH (fuselage crown area).
(2)
Make sure that there are no signs of corrosion, cracks or damage.
5. Close-up
________ Subtask 05-22-00-410-054
A. Close Access
(1) Remove the access platform(s).
ZONAL INSPECTION : COCKPIT - INSPECTION/CHECK
_____________________________________________
TASK 05-22-10-200-001
Zonal Inspection of the Cockpit (Zones 211 and 212)
1.
Reason for the Job
__________________
Refer to the MPD TASK: ZL-211-01
2.
Job Set-up Information
______________________
A. Referenced Information
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
05-22-10-991-001 Fig. 601
3. Job Set-up
__________
Subtask 05-22-10-010-050
A. Get Access
(Ref. Fig. 601/TASK 05-22-10-991-001)
(1) Remove the sidewall panels:
211AW, 211BW, 211EW,
212AW, 212BW, 212EW,
R 212JW.
NOTE : You can remove the sidewall panels 211FW, 212FW and 212HW as
____ R an alternative for the panels 211EW, 212EW and 212JW.
4. Procedure
_________
Subtask 05-22-10-210-050
A. Inspection
(1)
Do a general visual inspection of the cockpit.
(2)
Make sure that there are no signs of corrosion, cracks or damage.
(3)
Make sure that all the installations (wiring) are attached correctly.
Access Panels of the Cockpit
Figure 601/TASK 05-22-10-991-001
1EFF : ALL 1 05-22-10 Page 602
1 1 Feb 01/98
1 1
1CES 1
5. Close-up
________
Subtask 05-22-10-410-050
A. Close Access
(1) Install the sidewall panels:
211AW, 211BW, 211EW,
212AW, 212BW, 212EW,
R 212JW.
NOTE : Install the sidewall access panels 211FW, 212FW and 212HW if
____
you removed them.
TASK 05-22-10-200-002
Zonal Inspection of the Cockpit (Zones 211 and 212)
1.
Reason for the Job
__________________
Refer to the MPD TASK: ZL-211-02
2.
Job Set-up Information
______________________
A. Referenced Information
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
25-13-41-000-001 Removal of the Ceiling Panels 25-13-41-400-001 Installation of the Ceiling Panels 05-22-10-991-001 Fig. 601
3. Job Set-up
__________ Subtask 05-22-10-010-051
A. Get Access
(1)
Remove the ceiling panels:
211BC, 211FC, 211HC,
212BC, 212FC.
(Ref. TASK 25-13-41-000-001).
(2)
Remove the sidewall panel 212KW,
(Ref. Fig. 601/TASK 05-22-10-991-001)
4. Procedure
_________ Subtask 05-22-10-210-051
A. Inspection
(1)
Do a general visual inspection of the cockpit.
(2)
Make sure that there are no signs of corrosion, cracks or damage.
(3)
Make sure that all the installations (wiring, ducting, piping) are attached correctly.
NOTE : Lift the insulation blankets sufficiently to complete a
____ correct general visual inspection as necessary.
5. Close-up
________ Subtask 05-22-10-410-051
A. Close Access
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM 时间限制/维护检查 3(41)