• 热门标签

当前位置: 主页 > 航空资料 >

时间:2011-02-11 09:56来源:蓝天飞行翻译 作者:admin
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

 A. Close Access
 (1)
 Install the floor panels:
 131BF, 131CF, 131FF,
 131GF, 131JF, 131KF,
 132FF, 132GF, 132JF,
 132KF.
 (Ref. TASK 53-22-14-400-001)


 (2)
 Install the sidewall panel:
 131GW, 131HW, 131MW,
 132KW, 132MW.


 (3)
 Install the ceiling panels:
 131AC, 131BC, 131CC.


 (4)
 Close the FWD cargo compartment door 825 (Ref. TASK 52-30-00-860-002).

 (5)
 Remove the access platform(s).

 

R **ON A/C 151-199, 401-499,
 Subtask 05-21-30-410-055-A
 A. Close Access
 (1)
 Install the floor panels:
 131DG, 131EG,
 132DG, 132EG,
 (Ref. TASK 53-22-14-400-001)


 (2)
 Install the sidewall panels:
 131GW, 131HW,
 131SW, 132SW,
 132KW,


 (3)
 Install the ceiling panels:
 131NC, 131MC, 131PC,


 (4)
 Close the FWD cargo compartment door 825 (Ref. TASK 52-30-00-860-002).

 (5)
 Remove the access platform(s).

 


 **ON A/C 301-399,
 Subtask 05-21-30-410-055-B
 A. Close Access
 (1)
 Install the floor panels:
 131BF, 131CF, 131FF,
 131GF, 131JF, 131KF,
 131VF, 131YF, 131WF,
 131ZF,
 132FF, 132GF, 132JF,
 132KF, 132VF, 132YF.
 (Ref. TASK 53-22-14-400-001)


 (2)
 Install the sidewall panels:
 131GW, 131HW, 131MW,
 131QW, 131RW,
 132MW, 132KW, 132QW,
 132RW.


 (3)
 Install the ceiling panels:
 131AC, 131BC, 131CC,
 131DC, 131EC.


 (4)
 Close the FWD cargo compartment door 825 (Ref. TASK 52-30-00-860-002).

 (5)
 Remove the access platform(s).


R 1EFF : 151-199, 301-399, 401-499, 1 05-21-30Page 627 1 1 Aug 01/05 1 1 1CES 1


 ZONAL INSPECTION : CENTER WING - INSPECTION/CHECK
_________________________________________________
 TASK 05-21-40-200-001
 Zonal Inspection of the Wing Center Box (Zones 141 and 142)

 1.
 Reason for the Job

__________________
 Refer to the MPD TASK: ZL-141-01


 2.
 Job Set-up Information


______________________
 A. Fixtures, Tools, Test and Support Equipment
 -------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific access platform 2 m (6 ft. 7 in.)
 B. Referenced Information
 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
57-17-11-000-001 Removal of the Covers 147AZ (148AZ) 57-17-11-400-001 Installation of the Covers 147AZ (148AZ)
 3. Job Set-up
__________ Subtask 05-21-40-010-050
 A. Get Access
 (1)
 Put an access platform in position at the zones 141 and 142.

 (2)
 Remove the cover panels:
 147AZ, 148AZ, (Ref. TASK 57-17-11-000-001).

 


 4. Procedure
_________

 Subtask 05-21-40-210-050
 A. Inspection
 (1)
 Do a general visual inspection of the wing center box (Zones 141 and 142).

 (2)
 Make sure that there are no signs of corrosion, cracks or damage.

 (3)
 Make sure that all the installations (wiring, ducting, piping) are attached correctly.


 5. Close-up
________ Subtask 05-21-40-410-050
 A. Close Access
 (1)
 Install the cover panels:
 147AZ, 148AZ, (Ref. TASK 57-17-11-400-001).


 (2)
 Remove the access platform(s).

 

 TASK 05-21-40-200-002


 Zonal Inspection of the Pressurized Zone Under the Cabin Floor
 1.
 Reason for the Job

__________________
 Refer to the MPD TASK: ZL-145-01


 2.
 Job Set-up Information


______________________
 A. Referenced Information
 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
53-32-12-000-002 Removal of the Cabin Floor Panels 53-32-12-400-002 Installation of the Cabin Floor Panels
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM 时间限制/维护检查 3(26)