• 热门标签

当前位置: 主页 > 航空资料 >

时间:2011-02-11 09:59来源:蓝天飞行翻译 作者:admin
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

 


 -------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
 | |CODE| |  1  |  2  |  3  |SIGN|FIG.|
 |----|----|---------------------------------------|-----|-----|-----|----|----|

 |  |  | inspection of the side-stay |  |  |  |  |  |
 |  |  | attachment fitting. |  |  |  |  |  |
 |  |  | |  |  |  |  |  |
 |  F.|  |Examine the lockstay assembly and |  X  |  |  |  |  |
 |  |  |lockstay actuator for distortion, |  |  |  |  |  |
 |  |  |cracks and damaged paintwork and chrome|  |  |  |  |  |
 |  |  |plating. |  |  |  |  |  |
 |  |  |If you find damage: |  |  |  |  |  |
 |  |  |(1) Remove the lockstay assembly and |  |  X  |  |  |  |
 |  |  | lockstay actuator for overhaul |  |  |  |  |  |
 |  |  | (Ref. TASK 32-11-17-000-001) |  |  |  |  |  |
 |  |  | (Ref. TASK 32-11-21-000-001) |  |  |  |  |  |
 |  |  | (refer to the manufacturer's |  |  |  |  |  |
 |  |  | instructions for the overhaul |  |  |  |  |  |
 |  |  | procedure). |  |  |  |  |  |
 |  |  |(2) On the aircraft, continue the |  |  X  |  |  |  |
 |  |  | inspection of the attachment |  |  |  |  |  |
 |  |  | fittings for damage. |  |  |  |  |  |
 |  |  | |  |  |  |  |  |
 |  G.|  |Examine the MLG retraction actuator and|  X  |  |  |  |  |
 |  |  |its attachment fittings for distortion,|  |  |  |  |  |
 |  |  |cracks and damaged paintwork and chrome|  |  |  |  |  |
 |  |  |plating. |  |  |  |  |  |
 |  |  |If you find damage: |  |  |  |  |  |
 |  |  |(1) Remove the retraction actuator for |  |  X  |  |  |  |
 |  |  | strip-down inspection |  |  |  |  |  |
 |  |  | (Ref. TASK 32-31-46-000-001) |  |  |  |  |  |
 |  |  | (refer to the manufacturer's |  |  |  |  |  |
 |  |  | instructions for the |  |  |  |  |  |
 |  |  | strip-down procedure). |  |  |  |  |  |
 |  |  |(2) On the aircraft, continue the |  |  X  |  |  |  |
 |  |  | inspection of the attachment |  |  |  |  |  |
 |  |  | fittings for damage. |  |  |  |  |  |
 |  |  | |  |  |  |  |  |
 |  H.|  |Examine the MLG well for distortion, |  X  |  |  |  |  |
 |  |  |cracks, pulled or torn fasteners and |  |  |  |  |  |
 |  |  |damaged paintwork. |  |  |  |  |  |
 |  |  | |  |  |  |  |  |
 |  I.|  |Examine the electrical conduits, |  X  |  |  |  |  |
 |  |  |connections, connectors and flexible |  |  |  |  |  |
 |  |  |conduits for damage. |  |  |  |  |  |
 |  |  | |  |  |  |  |  |
 |  J.|  |If you removed components, install |  |  |  |  |  | 

R 1EFF : ALL 1 05-51-11Page 656 1 1 Nov 01/01 1 1 1CES 1


 -------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
 | |CODE| |  1  |  2  |  3  |SIGN|FIG.|
 |----|----|---------------------------------------|-----|-----|-----|----|----|

 |  |  |serviceable components:  |  |  |  |  |  |
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM 时间限制/维护检查 4