• 热门标签

当前位置: 主页 > 航空资料 >

时间:2011-02-11 09:56来源:蓝天飞行翻译 作者:admin
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

 (1)
 Close the main gear doors (Ref. TASK 32-12-00-410-001).

 (2)
 Remove the access platform(s).

 


 ZONAL INSPECTION : WING AILERON - INSPECTION/CHECK
__________________________________________________ TASK 05-25-90-200-001 Zonal Inspection of the Wing Aileron
 1. Reason for the Job
__________________
 Refer to the MPD TASK: ZL-590-01
 2. Job Set-up Information
______________________
 A. Fixtures, Tools, Test and Support Equipment
 -------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific access platform 2 m (6 ft. 7 in.)
 B. Referenced Information
 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
05-25-90-991-001 Fig. 601
 3. Job Set-up
__________ Subtask 05-25-90-010-050
 A. Get Access
 (1)
 Put an access platform in position.

 (2)
 Remove the access panels
 590AB, 590BB.
 690AB, 690BB.
 (Ref. Fig. 601/TASK 05-25-90-991-001)

 

 

 Access Panels of the Wing Aileron
 Figure 601/TASK 05-25-90-991-001
 1EFF :  ALL  1  05-25-90 Page 602 
1  1  Feb 01/98
 1  1
 1CES  1


 4. Procedure
_________

 Subtask 05-25-90-210-050
 A. Inspection
 (1)
 Do a general visual inspection of the aileron.

 (2)
 Make sure that there are no signs of corrosion, cracks or damage.

 (3)
 Make sure that all the installations are attached correctly.


 5. Close-up
________ Subtask 05-25-90-410-050
 A. Close Access
 (1)
 Install the access panels
 590AB, 590BB.
 690AB, 690BB.


 (2)
 Remove the access platform(s).

 


 ZONAL INSPECTION : LANDING GEAR AND LANDING GEAR DOORS - INSPECTION/CHECK
_________________________________________________________________________
 TASK 05-27-00-200-001
 Zonal Inspection as far as Visible from the Ground of the Landing Gear and the Landing Gear Doors
 1. Reason for the Job
__________________
R R Self Explanatory
 2.
 Job Set-up Information

______________________
 Not Applicable


 3.
 Job Set-up


__________
 Subtask 05-27-00-869-050

 A. Not applicable
 4. Procedure
_________
 Subtask 05-27-00-210-050

 A. Inspection
 (1)
 Do a general visual inspection of the landing-gear and the landing-gear doors from the ground during the aircraft walkaround.

 (2)
 Make sure that there are no signs of corrosion, cracks or damage.

 


 ZONAL INSPECTION : NOSE GEAR AND DOORS - INSPECTION/CHECK
_________________________________________________________
 TASK 05-27-10-200-001 
R R Zonal Inspection of Nose Gear and Nose Gear Doors 
1. Reason for the Job__________________ 
R  Refer to the MPD TASK: ZL-711-01
 2. Job Set-up Information______________________
 A. Referenced Information
 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
32-22-00-010-001 32-22-00-410-001  Nose Gear Doors - Ground Doors OpeningNose Gear Doors - Ground Doors Closing
 3. Job Set-up__________
 Subtask 05-27-10-010-050
 A. Get Access
 (1) Open the nose gear doors 713 and 714. (Ref. TASK 32-22-00-010-001)
 4. Procedure_________
 Subtask 05-27-10-210-050
 A. Inspection 
R R R  (1) Do a general visual inspection of the nose gear, the nose gear doors and the leg door attached to the nose gear. This inspection includes the zones 711, 712, 713, 714, 715 and 716.
 (2) Make sure that there are no signs of corrosion, cracks or damage.
 (3) Make sure that all the installations (wiring, ducting, piping) are attached correctly.


 5. Close-up
________

 Subtask 05-27-10-410-050
 A. Close Access
 (1) Close the nose gear doors 713 and 714. (Ref. TASK 32-22-00-410-001)


 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM 时间限制/维护检查 3(87)