4. Procedure
_________
Subtask 05-21-90-210-054
A. Inspection
R R (1) Do a general visual inspection of the hydraulic compartment and the fairings.
(2) Make sure that there are no signs of corrosion damage, cracks or other damage.
(3) Make sure that all the installations (wiring, ducting, piping) are correctly attached.
5. Close-up________
Subtask 05-21-90-410-054
A. Close Access
R R (1) Close the hydraulic reservoir pressurization access-door 195BB and the Yellow hydraulic compartment access-door 196BB.
(2) Remove the access platform(s).
TASK 05-21-90-200-007
Zonal Inspection of Rear Fairing
1.
Reason for the Job
__________________
Refer to the MPD TASK: ZL-197-01
2.
Job Set-up Information
______________________
A. Fixtures, Tools, Test and Support Equipment
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
No specific access platform 2 m (6 ft. 7 in.)
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
53-35-13-000-001 Removal of the Belly Fairing Access Panels 53-35-13-000-002 Removal of the Quick-Release Access Panels from the
Belly Fairing Structure 53-35-13-400-001 Installation of the Belly Fairing Access Panels 53-35-13-400-002 Installation of the Quick-Release Access Panels on
the Belly Fairing Structure
3. Job Set-up
__________ R **ON A/C 001-049, 051-099, 101-149, 201-299,
Subtask 05-21-90-010-056
A. Get Access R (1) Put an access platform in position at zones 197 and 198.
(2) Remove the access panels:
R 197AB, 197GB, 198GB (Ref. TASK 53-35-13-000-001) and 826GR, 197BB, 198BB (Ref. TASK 53-35-13-000-002).
R **ON A/C 151-199, 401-499,
Subtask 05-21-90-010-056-A
A. Get Access
(1)
Put an access platform in position at zones 197 and 198.
(2)
Remove the access panels: 826DR, 197AB, 197GB, 197KB, 198GB and 198KB (Ref. TASK 53-35-13-000-001),
**ON A/C 301-399,
Subtask 05-21-90-010-056-B
A. Get Access
(1)
Put an access platform in position at zones 197 and 198.
(2)
Remove the access panels:
197AB, 197GB, 198GB (Ref. TASK 53-35-13-000-001),
197KB, 198KB (Ref. TASK 53-35-13-000-002).
**ON A/C ALL
4. Procedure
_________ Subtask 05-21-90-210-056
A. Inspection
(1)
Do a general visual inspection of the rear fairing.
(2)
Make sure that there are no signs of corrosion, cracks or damage.
(3)
Make sure that all the installations (wiring, ducting, piping) are attached correctly.
5. Close-up
________
**ON A/C 001-049, 051-099, 101-149, 201-299,
Subtask 05-21-90-410-056
A. Close Access
(1) Install the access panels: 197AB, 197GB, 198GB (Ref. TASK 53-35-13-400-001), 826GR, 198BB, 197BB. (Ref. TASK 53-35-13-400-002)
(2) Remove the access platform(s). R **ON A/C 151-199, 401-499,
Subtask 05-21-90-410-056-A
A. Close Access
(1) Install the access panels: 826DR, 197AB, 197GB, 197KB, 198GB and 198KB (Ref. TASK 53-35-13-400-001).
(2) Remove the access platform(s).
**ON A/C 301-399,
Subtask 05-21-90-410-056-B
A. Close Access
(1)
Install the access panels:
197AB, 197GB, 198GB (Ref. TASK 53-35-13-400-001)
197KB, 198KB. (Ref. TASK 53-35-13-400-002)
(2)
Remove the access platform(s).
**ON A/C ALL
TASK 05-21-90-200-009
Zonal Inspection of the Air Conditioning Compartment and Fairings
1. Reason for the Job
__________________
Refer to the MPD TASK: ZL-191-02
2. Job Set-up Information
______________________
A. Fixtures, Tools, Test and Support Equipment
-------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM 时间限制/维护检查 3(39)