ZONAL INSPECTION : TRIMMABLE HORIZONTAL STABILIZER LEFT SIDE AND LEFT ELEVATOR
______________________________________________________________________________
INSPECTION/CHECK
________________ TASK 05-23-30-200-001 Zonal Inspection of the Leading Edge of the Trimmable Horizontal Stabilizer
1.
Reason for the Job
__________________
Refer to the MPD TASK: ZL-331-01
2.
Job Set-up Information
______________________
A. Fixtures, Tools, Test and Support Equipment
-------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific access platform 3 m (9 ft. 10 in.)
B. Referenced Information
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
55-12-11-000-001 Removal of the Horizontal Stabilizer Leading Edge 55-12-11-400-001 Installation of the Horizontal Stabilizer Leading Edge
3. Job Set-up
__________ Subtask 05-23-30-010-050
A. Get Access
(1)
Put an access platform in position.
(2)
Remove the leading edges:
331AB, 331BB, 331CB. (Ref. TASK 55-12-11-000-001)
(3)
Remove the access panels:
341AB, 341BB, 341CB. (Ref. TASK 55-12-11-000-001)
4. Procedure
_________
Subtask 05-23-30-210-050
A. Inspection
(1)
Do a general visual inspection of the leading edge of the trimmable horizontal stabilizer.
(2)
Make sure that there are no signs of corrosion, cracks or damage.
(3)
Make sure that all the installations (ducting, piping) are attached correctly.
5. Close-up
________ Subtask 05-23-30-410-050
A. Close Access
(1)
Install the leading edges:
331AB, 331BB, 331CB. (Ref. TASK 55-12-11-400-001)
(2)
Install the leading edges:
341AB, 341BB, 341CB. (Ref. TASK 55-12-11-400-001)
(3)
Remove the access platform(s).
TASK 05-23-30-200-002
Zonal Inspection of the Tip of the Trimmable Horizontal Stabilizer
1.
Reason for the Job
__________________
Refer to the MPD TASK: ZL-332-01
2.
Job Set-up Information
______________________
A. Fixtures, Tools, Test and Support Equipment
-------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific access platform 4 m (13 ft. 1 in.)
B. Referenced Information
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
55-14-11-000-001 Removal of the Tips 332AB/342AB 55-14-11-400-001 Installation of the Tips 332AB/342AB
3. Job Set-up
__________ Subtask 05-23-30-010-051
A. Get Access
(1)
Put an access platform in position.
(2)
Remove the tip 332AB / 342AB . (Ref. TASK 55-14-11-000-001)
4. Procedure
_________ Subtask 05-23-30-210-051
A. Inspection
(1)
Do a general visual inspection of the tip of the trimmable horizontal stabilizer.
(2)
Make sure that there are no signs of corrosion, cracks or damage.
(3) Make sure that all the installations (wiring, ducting, piping) are attached correctly. ________
5. Close-up
Subtask 05-23-30-410-051
A. Close Access
(1)
Install the tip 332AB / 342AB. (Ref. TASK 55-14-11-400-001)
(2)
Remove the access platform(s).
TASK 05-23-30-200-003
Zonal Inspection of the Spar Box of the Trimmable Horizontal Stabilizer
1. Reason for the Job__________________
Refer to the MPD TASK: ZL-333-01
2. Job Set-up Information______________________
A. Fixtures, Tools, Test and Support Equipment
-------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------