05-CONTENTS Page 14 Aug 01/05 R CES
CHAPTER 05
TIME LIMITS/MAINTENANCE CHECKS
TABLE OF CONTENTS
SUBJECT_______ CH/SE/SU C PAGE EFFECTIVITY
NON-REVENUE FLIGHT - REQUIREMENTS 05-59-00 FOLLOWING MAINTENANCE ACTIONS
DESCRIPTION AND OPERATION 1 ALL General 1 ALL Engine Replacement 1 ALL
FERRY FLIGHT WITH GEAR DOWN 05-59-32
MAINTENANCE PRACTICES 201 ALL Preparation for Ferry Flight with 201 ALL Gear Down Return to Normal Operation after a 203 ALL Ferry Flight with Gear Down
05-CONTENTS Page 15 Aug 01/05 R CES
TIME LIMITS - MAINTENANCE CHECKS - GENERAL - DESCRIPTION AND OPERATION______________________________________________________________________
1. General_______ This chapter includes the following sections: - 05-20-00: SCHEDULED MAINTENANCE CHECKS - 05-50-00: UNSCHEDULED MAINTENANCE CHECKS
A. Scheduled Maintenance Checks (05-20-00) This section includes all the zonal inspections that you must do on the aircraft.
B. Unscheduled Maintenance Checks (05-50-00) This section includes maintenance checks to be performed whenever a flight in abnormal conditions is reported by the Flight Crew. This section is divided into two categories of information: - inspections, - checks.
R R 2. Time Limits and Maintenance Checks__________________________________ The part of the Aircraft Maintenance Manual (AMM) was previously issued in a separate Manual to this AMM with the title: -------------------------------------------------------------------------------
R R Aircraft Maintenance Manual CHAPTER 05 Time Limits and Maintenance Checks
-------------------------------------------------------------------------------
R R R The content of this manual, since revision 20 approved on JUL07, 1999, is into the Maintenance Planning Manual (MPD) - Section 9.1: Life Limits/Monitored Parts.
1EFF : ALL 1 05-00-00 Page 1
1 1 Feb 01/03 1 1 1CES 1
SCHEDULED MAINTENANCE CHECKS - DESCRIPTION AND OPERATION
1. General
A. Task numbering This section gives the accomplishment instructions for zonal inspection tasks -related to the requirements of the Maintenance Planning Document (MPD)
a specific AMTOSS zonal task number which combines the ATA 05-20 and the concerned A/C zone is used as follows :
Task Numbering System for Zonal Inspection Tasks.
ATA Reference Number I""""""""""""""""I TASK N. 0 5 - 2 2 - 6 0 - 2 0 0 - 0 0 1 I__I I I______I I_____I I_____I 1 2 3 4 5
1 : ATA
2 : Relates to ATA section 20 scheduled maintenance checks
3 : Zone
4 : Function code, E.G. 200 : INSPECTION CHECK
5 : Unique identification of discrete tasks
B. Procedure content
(1)
It is thought that people which perform the zonal tasks have an adequate knowledge of the aircraft construction and systems installations thus a list of all the items contained in the zones to be inspected is not given.
(2)
If you find damage, corrosion, leaks, it is recommended to refer to the related structure/system inspection ata-chapter for detailed inspection and corrective action
(3)
Any Fairing, access panel, access door, etc removed or opened to gain access to zones should also be examined during the zonal inspection. This requirement is not specially quoted within each individual procedure because it is a standard maintenance practice.