05-25-70-991-003 Fig. 602 -------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
R **ON A/C 058-099, 102-149, 151-199, 201-299, 301-399, 401-499,
05-25-70-991-003-A Fig. 602A
**ON A/C ALL
05-25-70-991-002 Fig. 603
3. Job Set-up
__________
Subtask 05-25-70-866-054
A. Aircraft Maintenance Configuration
(1) Extend the spoilers (Ref. TASK 27-60-00-866-002).
(2) Fully extend the flaps (Ref. TASK 27-50-00-866-008).
Subtask 05-25-70-010-054
B. Get Access
(1)
Put an access platform in position.
(2)
Remove the access panels
575AT, 575KB, 575LB,
575MB.
**ON A/C 001-049, 051-057, 101-101,
(Ref. Fig. 601/TASK 05-25-70-991-001) R **ON A/C 058-099, 102-149, 151-199, 201-299, 301-399, 401-499,
(Ref. Fig. 601A/TASK 05-25-70-991-001-A)
**ON A/C ALL
675AT, 675KB, 675LB,
675MB.
**ON A/C 001-049, 051-057, 101-101,
(Ref. Fig. 602/TASK 05-25-70-991-003) R **ON A/C 058-099, 102-149, 151-199, 201-299, 301-399, 401-499,
(Ref. Fig. 602A/TASK 05-25-70-991-003-A)
**ON A/C ALL
(Ref. Fig. 603/TASK 05-25-70-991-002)
4. Procedure
_________
Subtask 05-25-70-210-054
A. Inspection
(1)
Do a general visual inspection of the fixed structure (Outboard).
(2)
Make sure that there are no signs of corrosion, cracks or damage.
(3)
Make sure that all the installations (wiring, ducting, piping) are attached correctly.
5. Close-up
________
Subtask 05-25-70-410-054
A. Close Access
(1)
Install the access panels
575AT, 575KB, 575LB,
575MB,
675AT, 675KB, 675LB,
675MB.
(2)
Remove the access platform(s).
Access Panel of the Upper Surface of the Wing
Figure 603/TASK 05-25-70-991-002
1EFF : ALL 1 05-25-70 Page 619
1 1 Nov 01/01
1 1
1CES 1
Subtask 05-25-70-866-055
B. Aircraft Maintenance Configuration
(1)
Fully retract the flaps (Ref. TASK 27-50-00-866-009).
(2)
Fully retract the spoilers (Ref. TASK 27-60-00-866-002).
TASK 05-25-70-200-006
Zonal Inspection of the Main Landing Gear Bay
1.
Reason for the Job
__________________
Refer to the MPD TASK: ZL-571-02
2.
Job Set-up Information
______________________
A. Fixtures, Tools, Test and Support Equipment
-------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific access platform 3 m (9 ft. 10 in.)
B. Referenced Information
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
32-12-00-010-001 Open the Main Gear Doors for Access 32-12-00-410-001 Close the Main Gear Doors after Access
3. Job Set-up
__________ Subtask 05-25-70-010-055
A. Get Access
(1)
Put an access platform in position at the zones 571 and 671.
(2)
Open the main landing-gear doors (Ref. TASK 32-12-00-010-001).
4. Procedure
_________ Subtask 05-25-70-210-055
A. Inspection
(1)
Do a general visual inspection of the main landing-gear bay.
(2)
Make sure that there are no signs of corrosion, cracks or damage.
(3) Make sure that all the installations (wiring, ducting, piping) are attached correctly. ________
5. Close-up
Subtask 05-25-70-410-055
A. Close Access
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM 时间限制/维护检查 3(86)