(2)
Remove the access panels:
325BL, 325CL, 325DL,
R 325BR. (Ref. TASK 55-33-13-010-001) or (Ref. TASK 55-33-13-010-002).
4. Procedure
_________
Subtask 05-23-20-210-054
A. Inspection
(1)
Do a general visual inspection of the trailing edge of the vertical stabilizer.
(2)
Make sure that there are no signs of corrosion, cracks or damage.
(3)
Make sure that all the installations (wiring, ducting, piping) are attached correctly.
5. Close-up
________
Subtask 05-23-20-410-054
A. Close Access
(1) Install the access panels:
325BL, 325CL, 325DL,
R 325BR. (Ref. TASK 55-33-13-410-001) or (Ref. TASK 55-33-13-410-002)
(2) Remove the access platform(s).
R
TASK 05-23-20-200-006
Zonal Inspection of Rudder
1. Reason for the Job
__________________
Refer to the MPD TASK: ZL-326-01
2. Job Set-up Information
______________________
A. Fixtures, Tools, Test and Support Equipment
-------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific access platform 10 m (32 ft. 10 in.)
B. Referenced Information
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
53-55-12-000-001 Removal of the Rudder Fairings 325AL and 325AR 53-55-12-400-001 Installation of the Rudder Fairings 325AL and 325AR 55-33-13-010-001 Opening of the Trailing Edge Access-Panels 325EL,
325ER, 325DL, 325DR, 325CL, 325CR, 325BL and 325BR
55-33-13-010-002 Opening/Removal of the Trailing Edge Access-Panels 325EL, 325ER, 325DL, 325DR, 325CL, 325CR, 325BL and 325BR
55-33-13-410-001 Closing of the Trailing Edge Access-Panels 325EL, 325ER, 325DL, 325DR, 325CL, 325CR, 325BL and 325BR
55-33-13-410-002 Closing/Installation of the Trailing Edge Access-Panels 325EL, 325ER, 325DL, 325DR, 325CL, 325CR, 325BL and 325BR
55-44-11-000-001 Removal of the Rudder Tip 55-44-11-400-001 Installation of the Rudder Tip
R 1EFF : ALL 1 05-23-20Page 612 1 1 May 01/05 1 1 1CES 1
3. Job Set-up__________
Subtask 05-23-20-010-055
A. Get Access
(1) Put an access platform in position at zone 320.
R R R R R R (2) Remove the access panels: 325AL, 325AR (Ref. TASK 53-55-12-000-001), 325BL, 325BR, 325CL, 325CR, 325DL, 325DR, 325EL, 325ER (Ref. TASK 55-33-13-010-001) or (Ref. TASK 55-33-13-010-002), 326AT (Ref. TASK 55-44-11-000-001).
4. Procedure_________
Subtask 05-23-20-210-055
A. Inspection
(1) Do a general visual inspection of the rudder.
(2) Make sure that there are no signs of corrosion, cracks or damage.
(3) Make sure that all the installations (wiring, ducting, piping) are attached correctly.
5. Close-up________
Subtask 05-23-20-410-055
A. Close Access
R R R R R (1) Install the access panels: 326AT (Ref. TASK 55-44-11-400-001), 325BL, 325BR, 325CL, 325CR, 325DL, 325DR, 325EL, 325ER (Ref. TASK 55-33-13-410-001) or (Ref. TASK 55-33-13-410-002), 325AL, 325AR (Ref. TASK 53-55-12-400-001).
(2) Remove the access platform(s).
R 1EFF : ALL 1 05-23-20Page 613 1 1 May 01/05 1 1 1CES 1
R
TASK 05-23-20-200-007
Zonal Inspection of Vertical Stabilizer Trailing Edge
1. Reason for the Job
__________________
Refer to the MPD TASK: ZL-325-02
2. Job Set-up Information
______________________
A. Fixtures, Tools, Test and Support Equipment
-------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific access platform 10 m (32 ft. 10 in.)
B. Referenced Information
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
53-55-12-000-001 Removal of the Rudder Fairings 325AL and 325AR 53-55-12-400-001 Installation of the Rudder Fairings 325AL and 325AR 55-33-13-010-001 Opening of the Trailing Edge Access-Panels 325EL,
325ER, 325DL, 325DR, 325CL, 325CR, 325BL and 325BR
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM 时间限制/维护检查 3(61)