(2)
Make sure that there are no signs of corrosion, cracks or damage.
TASK 05-24-00-200-002
Zonal Inspection of the Power Plant, the Nacelles and the Pylons
1.
Reason for the Job
__________________
Refer to the MPD TASK: ZL-400-02
2.
Job Set-up Information
______________________
A. Fixtures, Tools, Test and Support Equipment
-------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific access platform 2 m (6 ft. 7 in.)
3. Job Set-up
__________ Subtask 05-24-00-010-051
A. Get Access
(1) Put an access platform in position.
4. Procedure
_________ Subtask 05-24-00-210-051
A. Inspection
(1)
Do a general visual inspection of the power plant, the nacelles and the pylons.
(2)
Make sure that there are no signs of corrosion, craks or damage.
5. Close-up
________ Subtask 05-24-00-410-051
A. Close Access
(1) Remove the access platform(s).
ZONAL INSPECTION : ENGINE PYLON BOX AND FORWARD FAIRING - INSPECTION/CHECK
__________________________________________________________________________ TASK 05-24-10-200-001 Zonal Inspection of Upper Forward Pylon
1.
Reason for the Job
__________________
Refer to the MPD TASK: ZL-411-01
2.
Job Set-up Information
______________________
A. Fixtures, Tools, Test and Support Equipment
-------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific access platform 2 m (6 ft. 7 in.)
B. Referenced Information
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
05-24-10-991-001 Fig. 601 05-24-10-991-002 Fig. 602 05-24-10-991-003 Fig. 603 05-24-10-991-004 Fig. 604
3. Job Set-up
__________ Subtask 05-24-10-010-050
A. Get Access
(1)
Put an access platform in position.
(2)
Remove the access panels:
-For the left pylon:
(Ref. Fig. 601/TASK 05-24-10-991-001)
413AL, 413BL, 413CL,
413DL, 413EL.
(Ref. Fig. 602/TASK 05-24-10-991-002)
1EFF : ALL 1 05-24-10Page 601 1 1 May 01/04R 1 1 1CES 1
R Access Panels and Doors of the Left Nacelle (Left Side) Figure 601/TASK 05-24-10-991-001
1EFF : ALL 1 05-24-10Page 602 1 1 May 01/04 1 1 1CES 1
R Access Panels and Doors of the Left Nacelle (Right Side) Figure 602/TASK 05-24-10-991-002
1EFF : ALL 1 05-24-10Page 603 1 1 May 01/04 1 1 1CES 1
414AR, 414AZ, 414BR,
414CR, 414FR.
-For the right pylon:
(Ref. Fig. 603/TASK 05-24-10-991-003)
423AL, 423AZ, 423BL,
423CL, 423DL, 423FL.
(Ref. Fig. 604/TASK 05-24-10-991-004)
424AR, 424BR,
424CR, 424ER.
4. Procedure
_________
Subtask 05-24-10-210-050
A. Inspection
(1)
Do a general visual inspection of the upper forward pylon (Zones 411, 413, 414, 421, 423 and 424).
(2)
Make sure that there are no signs of corrosion, craks or damage.
(3)
Make sure that all the installations (wiring, ducting, piping) are attached correctly.
5. Close-up
________
Subtask 05-24-10-410-050
A. Close Access
(1)
Install the access panels:
-
For the left pylon:
413AL, 413BL, 413CL,
413DL, 413EL,
414AR, 414AZ, 414BR,
414CR, 414FR.
-
For the right pylon:
423AL, 423AZ, 423BL,
423CL, 423DL, 423FL,
424AR, 424BR,
424CR, 424ER.
(2)
Remove the access platform(s).
1EFF : ALL 1 05-24-10Page 604 1 1 May 01/04R 1 1 1CES 1
R Access Panels and Doors of the Right Nacelle (Left Side) Figure 603/TASK 05-24-10-991-003
1EFF : ALL 1 05-24-10Page 605 1 1 May 01/04 1 1 1CES 1
R Access Panels and Doors of the Right Nacelle (Right Side) Figure 604/TASK 05-24-10-991-004
1EFF : ALL 1 05-24-10Page 606 1 1 May 01/04 1 1 1CES 1
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM 时间限制/维护检查 3(66)