A. Get Access
R (1) Put an access platform in position at zones 812 and 822.
R (2) Open the forward avionics compartment doors 812, 822 (Ref. TASK 52-41-00-010-002). (Ref. Fig. 601/TASK 05-28-10-991-001, 602/TASK 05-28-10-991-002)
R Avionics Compartment Right Side Door Figure 602/TASK 05-28-10-991-002
1EFF : 1 1 1CES ALL 1 111 05-28-10 Page 607 Nov 01/03
4. Procedure
_________
Subtask 05-28-10-210-052
A. Inspection
(1) Do a general visual inspection of the lateral avionics compartment doors 812 and 822.
R (2) Make sure that there are no signs of corrosion, cracks or damage.
5. Close-up
________
Subtask 05-28-10-410-052
A. Close Access
R (1) Close the lateral avionics compartment doors 812, 822 (Ref. TASK 52-41-00-410-002).
(2) Remove the access platform(s).
TASK 05-28-10-200-004
R Zonal Inspection of Lateral Avionics Compartment Doors
1. Reason for the Job__________________
Refer to the MPD TASK: ZL-812-02
2. Job Set-up Information______________________
A. Fixtures, Tools, Test and Support Equipment
-------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific access platform 1.80 m (5 ft. 11 in.)
B. Referenced Information
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
52-41-00-010-002 52-41-00-410-002 05-28-10-991-001 05-28-10-991-002 Open the Avionics Compartment Doors for AccessClose the Avionics Compartment Doors after AccessFig. 601Fig. 602
3. Job Set-up__________
Subtask 05-28-10-010-053
A. Get Access
R (1) Put an access platform in position at zones 812 and 822.
R (2) Open the forward avionics compartment doors 812, 822 (Ref. TASK 52-41-00-010-002). (Ref. Fig. 601/TASK 05-28-10-991-001, 602/TASK 05-28-10-991-002)
R (3) Remove the door panels and the insulation blankets.
4. Procedure
_________
Subtask 05-28-10-210-053
R A. Inspection
(1) Do a general visual inspection of the lateral avionics compartment doors 812 and 822.
(2) Make sure that there are no signs of corrosion, cracks or damage.
5. Close-up________
Subtask 05-28-10-410-053
A. Close Access
R (1) Install the door panels and the insulation blankets.
R (2) Close the lateral avionics compartment doors 812, 822 (Ref. TASK 52-41-00-410-002).
(3) Remove the access platform(s).
ZONAL INSPECTION : AVIONICS COMPARTMENT DOORS, CARGO COMPARTMENT DOORS (RIGHT_____________________________________________________________________________ SIDE) - INSPECTION/CHECK________________________
TASK 05-28-20-200-001
R R Zonal Inspection of FWD Cargo-Compartment Door Including Fuselage Door Sill, Door Seal and Lock Fittings
1. Reason for the Job__________________
Refer to the MPD TASK: ZL-825-01
2. Job Set-up Information______________________
R A. Fixtures, Tools, Test and Support Equipment
R R R -------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
R No specific access platform 2.00 m (6 ft. 7 in.)
R B. Referenced Information
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
52-30-00-860-001 52-30-00-860-002 中国航空网 www.aero.cn 航空翻译 www.aviation.cn 本文链接地址:A320飞机维护手册 AMM 时间限制/维护检查 3(90)