3. Job Set-up
__________
Subtask 05-23-20-010-052
A. Get Access
(1)
Put an access platform in position at the zone 320.
(2)
Remove the access panels:
321AL, (Ref. TASK 53-45-11-000-001)
323AL, 323AR, (Ref. TASK 53-55-11-000-001)
325AR, 325AL, (Ref. TASK 53-55-12-000-001)
322BL. (Ref. TASK 55-32-11-000-001)
(3)
Remove and discard the aluminium tape from the lightening holes in the front spar.
4. Procedure
_________ Subtask 05-23-20-210-052
A. Inspection
(1)
Do a general visual inspection of the spar box of the vertical stabilizer.
(2)
Make sure that there are no signs of corrosion, cracks or damage.
(3)
Make sure that all the installations (wiring, ducting, piping) are attached correctly.
5. Close-up
________ Subtask 05-23-20-410-052
A. Close Access
(1)
Cut and install the BONDING AND ADHESIVE COMPOUNDS (Material No. 08-061) over the lightening holes on the front spar.
(2)
Install the access panels:
322BL, (Ref. TASK 55-32-11-400-001)
325AR, 325AL, (Ref. TASK 53-55-12-400-001)
323AR, 323AL, (Ref. TASK 53-55-11-400-001)
321AL
(Ref. TASK 53-45-11-400-001)
(3)
Remove the access platform(s).
TASK 05-23-20-200-004
R Zonal Inspection of Vertical Stabilizer Tip
1. Reason for the Job__________________
Refer to the MPD TASK: ZL-324-01
2. Job Set-up Information______________________
A. Fixtures, Tools, Test and Support Equipment
-------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific access platform 11 m (36 ft. 1 in.)
B. Referenced Information
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
R R 55-34-11-000-001 55-34-11-400-001 Removal of the Vertical Stabilizer Tip Installation of the Vertical Stabilizer Tip
3. Job Set-up__________
Subtask 05-23-20-010-053
A. Get Access
R R (1) Put an access platform in position at the vertical stabilizer tip level.
(2) Remove the vertical stabilizer tip 324AT. (Ref. TASK 55-34-11-000-001)
4. Procedure_________
Subtask 05-23-20-210-053
A. Inspection
(1) Do a general visual inspection of the vertical stabilizer tip.
(2) Make sure that there are no signs of corrosion, cracks or damage.
(3) Make sure that all the installations (wiring) are attached correctly.
5. Close-up
________ Subtask 05-23-20-410-053
A. Close Access
(1)
Install the vertical stabilizer tip 324AT. (Ref. TASK 55-34-11-400-001)
(2)
Remove the access platform(s).
TASK 05-23-20-200-005
Zonal Inspection of the Trailing Edge of the Vertical Stabilizer
1. Reason for the Job
__________________
Refer to the MPD TASK: ZL-325-01
2. Job Set-up Information
______________________
A. Fixtures, Tools, Test and Support Equipment
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
No specific access platform 10 m (32 ft. 10 in.)
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
55-33-13-010-001 Opening of the Trailing Edge Access-Panels 325EL, 325ER, 325DL, 325DR, 325CL, 325CR, 325BL and 325BR
55-33-13-010-002 Opening/Removal of the Trailing Edge Access-Panels 325EL, 325ER, 325DL, 325DR, 325CL, 325CR, 325BL and 325BR
55-33-13-410-001 Closing of the Trailing Edge Access-Panels 325EL, 325ER, 325DL, 325DR, 325CL, 325CR, 325BL and 325BR
55-33-13-410-002 Closing/Installation of the Trailing Edge Access-Panels 325EL, 325ER, 325DL, 325DR, 325CL, 325CR, 325BL and 325BR
3. Job Set-up
__________
Subtask 05-23-20-010-054
A. Get Access
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM 时间限制/维护检查 3(60)