R 1EFF : 001-003, 051-054, 1 05-51-11Page 619 1 1 May 01/05 1 1 1CES 1


 Nose Landing Gear Figure 606/TASK 05-51-11-991-010 
R 1EFF : 1 1 1CES  ALL  1 111 05-51-11 Page 620 Feb 01/01

 

 Subtask 05-51-11-210-058

 J. Inspection of the Main Gear Doors
 -------------------------------------------------------------------------------|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.| | |CODE| |  1  |  2  |  3  |SIGN|FIG.| |----|----|---------------------------------------|-----|-----|-----|----|----| |1. | | Main Gear Doors | | | | | | | | | | | | | | | |  A.| | Do an inspection of the doors, the |  X  | | | | | | | | hinges and the adjacent structure. | | | | | | | | | | | | | | | |2. | | Main-Gear Fixed Fairing | | | | | | | | | | | | | | | |  A.| | Make an inspection of the fixed |  X  | | | | | | | | fairing and the attachments to the | | | | | | | | | main-gear leg | | | | | | | | | | | | | | | |3. | | Main-Gear Hinged Fairing | | | | | | | | | | | | | | | |  A.| | Do an inspection of the hinged fairing|  X  | | | | | | | | and the attachments to the main gear | | | | | | | | | leg and the wing. | | | | | | -------------------------------------------------------------------------------
Subtask 05-51-11-210-059
 K. Inspection of the Flap Operating Mechanism (Ref. TASK 27-54-00-200-001)
 -------------------------------------------------------------------------------|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.| | |CODE| |  1  |  2  |  3  |SIGN|FIG.| |----|----|---------------------------------------|-----|-----|-----|----|----| |1. | | Flap Operating Mechanism | | | | | | | | | | | | | | | |  A.| | Do an inspection of the flap operating|  X  | | | | | | | | mechanism | | | | | | | | | (Ref. TASK 27-54-00-200-001). | | | | | | | | | If there are indications of damage: | | | | | | | | | (1) Remove the applicable component(s)| |  X  | | | | | | | for component maintenance. | | | | | | | | | (2) Do an inspection of the | |  X  | | | | | | | component(s) attachments. | | | | | | | | | If these are indications of damage| | | | | | | | | (a) Remove the attachments of the | | |  X  | | | | | | component(s). | | | | | |
R 1EFF : 001-003, 051-054, 1 05-51-11Page 621 1 1 May 01/05 1 1 1CES 1


 -------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.| | |CODE| |  1  |  2  |  3  |SIGN|FIG.| |----|----|---------------------------------------|-----|-----|-----|----|----| | | | (b) Do an inspection of the component | | |  X  | | | | | | attachment/structure interface. | | | | | | -------------------------------------------------------------------------------
Subtask 05-51-11-210-070
 L. Inspection of the Flap Tracks and Attachments (Fuselage) (Ref. TASK 57-51-33-000-001) (Ref. TASK 57-51-33-400-001)
 -------------------------------------------------------------------------------|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.| | |CODE| |  1  |  2  |  3  |SIGN|FIG.| |----|----|---------------------------------------|-----|-----|-----|----|----| |1. | | Flap Tracks and Attachments | | | | | | | | | | | | | | | |  A.| | Get access to the MLG well and the aft|  X  | | | | | | | | cargo compartment. | | | | | | | | | Do an inspection of the flap track N.1| | | | | | | | | attachments at FR45 and FR47 for: | | | | | | | | | - damage, | | | | | | | | | - cracks, | | | | | | | | | - correct condition of the fasteners | | | | | | | | | and the safety devices. | | | | | | | | | | | | | | | |  B.| | Examine the flap track N.1 for: |  X  | | | | | | | | - cracks, | | | | | | | | | - correct condition of the fasteners | | | | | | | | | and the safety devices, | | | | | | | | | - damaged sealant. | | | | | | | | | | | | | | | | | | If you find signs of damage: | |  X  | | | | | | | (1) Remove the flap track N.1 for | | | | | | | | | component maintenance | | | | | | | | | (Ref. TASK 57-51-33-000-001). | | | | | | | | | (2) Remove the flap track N.1 | | | | | | | | | attachments at FR45 and FR47. | | | | | | | | | (3) Do an inspection of the flap track| | | | | | | | | N.1 attachment/structure interface| | | | | | | | | for damage. | | | | | | | | | (4) Install the flap track N.1 | | | | | | | | | (Ref. TASK 57-51-33-400-001). | | | | | | -------------------------------------------------------------------------------
R 1EFF : 001-003, 051-054, 1 05-51-11Page 622 1 1 May 01/05 1 1 1CES 1 Subtask 05-51-11-210-060


 M. Inspection of the Wing (Ref. TASK 57-55-11-000-001) (Ref. TASK 57-55-11-400-001) (Ref. TASK 57-51-33-000-002) (Ref. TASK 57-51-33-400-002) (Ref. TASK 57-51-33-000-003) (Ref. TASK 57-51-33-400-003) (Ref. TASK 57-51-33-000-004) (Ref. TASK 57-51-33-400-004) (Ref. TASK 28-25-00-650-001) (Ref. TASK 28-10-00-910-002)
 